Whitby · Construction story
A Whitby basement takes shape around the windows
The bank of windows is the easiest way to recognize this Whitby basement across three stages of work. In the first photo, daylight falls on bare concrete. By the time the flooring goes down, you can see where that light reaches across the dark boards.
The room before framing
The windows and the glass doors beside them already bring daylight into the basement. Look up and you can see the floor joists running toward the windows and a metal duct crossing them. Those two heights matter when you picture the ceiling overhead.
Where the ceiling steps down
Stand facing the glass doors. The wood framing overhead outlines a lower section of ceiling that runs toward them. On either side, the joists are still exposed. This is the stage when you can stand under that lower section and judge how it feels as you walk outside.
The floor going in
The camera now faces across the room, with the windows on the left. Recessed lights are on in the white ceiling. An installer kneels where the dark boards meet the exposed subfloor. Along the windows, you can already see the daylight reflected in the first rows.
Plan my Whitby basement
Tell us where the windows are and how you want to use the space.
Book my free visit
Tell us your city, the rooms involved and your rough timing. We reply with the next step.
Yan answers calls and WhatsApp himself. Prefer to talk? Call (905) 889-0025 or WhatsApp Yan.