Full-home renovation
Plan the kitchen, bathrooms, adjoining rooms and finishes together, including what you want to keep.
WSIB & $5M+ insured.
Capable coordinates design, permits and construction, including underpinning when it is part of your agreed renovation scope.
Our quote itemizes the agreed work. If another quote covers a different scope, bring it—we can review the allowances, exclusions and missing work with you.
Planning a kitchen, bathroom or a larger renovation in Milton? We define the rooms you want to change and what you want to keep. When the work connects several spaces, we coordinate the layout, permits, trades and finishes in one agreed scope. See how we plan a full-home renovation, explore whole-home budget ranges and review the full-home timeline.
Your house should support the way you live now, not an outdated layout from years ago. A well planned Milton house renovation can open crowded main floors, add needed storage, improve lighting, and give each room a more polished look. It is not just about new finishes. It is about making daily routines easier and every square foot more useful. When the layout works better, your home feels better to live in and more appealing if you ever decide to sell.
As a Milton home renovation company, we manage projects from concept to completion, from kitchens and bathrooms to basements and full home renovations. We start with a clear written quote, realistic planning, and interactive 3D design so you can see the result before construction begins. Then we handle permits, inspections, scheduling, and site protection with one accountable point of contact. With 25 plus years in the GTA, 2,000 completed projects, strong insurance coverage, and a lifetime warranty, we deliver work that holds up.
A basement finish, a separate suite and an addition have different purposes. Make the intended result clear when deciding the rooms, services and work to retain. That gives the drawings a defined scope instead of leaving important choices until construction.
If the approved plan later needs to change, Milton uses a different route for revisions from its normal online application tool. Keep decisions about the layout connected to the permit administrator and the current drawings.
25 years in the GTA · WSIB & $5M+ insured.
Start with one room, plan several rooms together, or renovate the whole home. Explore the work that fits your plans; the estimate will define what is included and what you want to keep.
Bring the kitchen, bathrooms and adjoining rooms into one plan. Decide what to keep, where the layout needs to change and which structural or service work connects the rooms. We coordinate design, permits and construction for the agreed scope, whether you build together or in phases.
Plan a whole-home budget →
Capable Group starts with the space you need and checks the lot, existing layout, structure, roofline, services and permit path before pricing the build seriously. The aim is an addition that connects properly to the home you want to keep, with the work and budget understood before the design goes too far.
Turn an underused basement into a family room, home office, gym, guest area, or legal secondary space with proper framing, insulation, lighting, flooring, and code aware planning. A finished basement adds usable square footage, improves comfort, and makes your Milton home work harder without the cost of moving.
Estimate basement costs →
Basement renovation in Milton →
Start with how you use the kitchen: preparation space, storage, appliance positions and lighting. Keep a layout that works, or plan the plumbing, electrical and adjoining-room changes needed for a new one. Cabinetry, counters and finishes belong in the same agreed scope.
Understand kitchen costs →
Plan the shower or bath, vanity, storage and lighting together with waterproofing and ventilation. Keeping workable fixture locations and moving plumbing are different scopes. We help define the room you want and the work behind the finished tile.
Estimate bathroom costs →
Comfort and approvals belong in the same renovation plan. Review insulation, air sealing, windows and doors alongside layouts and finishes. We help with drawings, permit applications and inspections for the agreed work, so those decisions are made before the affected construction starts.
A kitchen renovation can also affect the dining room, a stair or the services below it. Decide which connections belong in the work before choosing finishes: the rooms you keep matter as much as the rooms you change.
Capable Group brings 25 years of renovation experience to your Milton project. We coordinate design, permits and construction for the agreed scope, with one contract, one schedule and one person to call. Free 3D design and permit drawings before you sign help you review the layout alongside a fixed, itemized quote. Start with one room or bring the whole-house plan; Yan, the owner, answers calls and WhatsApp himself.
Plan the kitchen, bathrooms, adjoining rooms and finishes together, including what you want to keep.
Basement renovation · Underpinning · Legal basement apartment
Start with the intended use and existing height. Review any floor lowering, finishing and apartment approval requirements as distinct parts of the scope.
Review the structure, foundations, roof connections and services before settling the drawings, permit and build plan.
Look at the rooms and connections you want to improve, then open the project for its photographs and scope. Each example identifies its actual location and stage of work.
See how completed Capable projects connect kitchens, bathrooms and adjoining rooms. Open a project to view its photos and the work involved.
Mississauga · Full-home renovation
A completed home-and-basement renovation with connected living and dining areas, bathrooms and a covered entry.
The completed work includes the kitchen, living and dining areas, bathrooms, basement rooms and front entry.
White cabinetry and an island with sink and seating connect the kitchen to dining and family space.
Toronto · Full-home renovation
Kitchen, bathrooms, an upper terrace and a covered outdoor living area in one completed Toronto renovation.
The completed renovation includes the kitchen, several bathrooms, the entrance, an upper terrace and a covered outdoor living area.
Vaughan · Full-home renovation
The renovation carries through the kitchen and living area into bathrooms, laundry, storage and the stairs between spaces.
You are choosing who will open up your home, manage the work and see it through. Compare the commitments behind the price: what you will receive, when decisions are made, and who remains responsible.
Capable Group
What to expect
Our quote itemizes the agreed work. If another quote covers a different scope, bring it—we can review the allowances, exclusions and missing work with you.
Compare the same materials, allowances and exclusions before deciding which quote offers better value.
Picture the proposed rooms and review the design alongside the scope and price.
Check the proposed layout and room connections while changes can still be made on the plan.
Read the coverage and claim conditions with your agreement. Electrical issues have two-year coverage. Notice: To file a warranty claim, a $350 deposit is required. If the issue is covered by our warranty, this amount will be refunded to you. View warranty coverage and claims.
Know what is covered and whether that protection can stay with the house.
One project lead keeps the schedule and decisions connected.
Use the written schedule and photo updates to understand the current stage and decisions coming next.
Review the payment schedule alongside the agreed scope before signing.
Match each payment to its agreed stage and review the finished work at your walkthrough.
Capable coordinates design, permits and construction, including underpinning when it is part of your agreed renovation scope.
Discuss changes with the team coordinating the adjoining rooms and trades.
We identify what needs further investigation before the affected work is finalized, so the scope addresses more than the finished surfaces.
Understand what needs investigation before choosing finishes that could conceal the problem.
Yan answers calls and WhatsApp himself.
Bring questions about the scope, price or progress directly to Yan.
Choose from pot lights, a heated bathroom floor, upgraded tile or a closet build-out. The offer has no expiry date.
Review the eligible choices alongside your renovation scope before selecting the upgrade.
Send the scope, city, and timing. We’ll review the project and reply with the next step before you book.
Recognized by Global Media
A homeowner’s experience
“They updated our kitchen and three bathrooms.” — Lois, April 3, 2025
5★ Rated on Google
Posted on Google Marc MuehlethalerTrustindex verifies that the original source of the review is Google. Great experience. Recently did my 1200 square foot basement. Stress free experience. Accurate quote. Great communication and on time with good quality. Love our new space.Posted on Google Becky SherlockTrustindex verifies that the original source of the review is Google. The Capable Group did a wonderful job renovating our 100 year old basement! All of the workers sent to my home were competent in their trades and professional to deal with. The project manager and site supervisor were responsive to questions and very helpful. What started out as a basement refinishing project ended up requiring some underpinning, waterproofing and structural reinforcement. The Capable Group team was able to handle the expanded scope and completed the job within the agreed to budget!Posted on Google Tee Alexandria CampbellTrustindex verifies that the original source of the review is Google. Nazar and his team did a fantastic job! I would recommend them to anyone!Posted on Google Rita FinchTrustindex verifies that the original source of the review is Google. The kitchen remodeling services provided by Capable Group Inc. exceeded my expectations. They skillfully adjusted the arrangement, improving its functionality and flow. My kitchen now looks more streamlined and modern thanks to the custom countertop and cabinet options.Posted on Google Trevpr RobertsTrustindex verifies that the original source of the review is Google. Owing to spatial constraints, I managed to obtain just what I required from them. They carefully considered how to make the greatest use of the limited area, how to add mirrors, and how to make sure the flooring was suitable for my purposes before transforming my basement into an amazing fitness center. Their help allowed me to purchase the gym of my dreams.Posted on Google Virginina TechTrustindex verifies that the original source of the review is Google. I just wanted to say thank you for the fantastic basement makeover that Capable Group Inc. completed! They've made it into the perfect place to hang out and host parties. I think their efforts and abilities are very amazing. You guys did a fantastic job!Posted on Google Archie SandersTrustindex verifies that the original source of the review is Google. I adore having a home gym, but I ran out of room. Capable Groups made the most of the available space, updated the flooring, and added mirrors to turn my basement into a terrific workout area. I now own the home gym of my dreams!Posted on Google Richa KhuranaTrustindex verifies that the original source of the review is Google. We did our basement finishing from Capable group. It was seamless process and they were very professional.Posted on Google Conner DrewTrustindex verifies that the original source of the review is Google. We are grateful to Capable Group Inc. for the wonderful basement makeover. The space was transformed entirely, making it a fantastic place to host events and chill out with friends. I must say, their skills and commitment are really impressive. Fantastic work, gentlemen!Verified by TrustindexTrustindex verified badge is the Universal Symbol of Trust. Only the greatest companies can get the verified badge who has a review score above 4.5, based on customer reviews over the past 12 months. Read more
Discuss the rooms, inspect the home and define the work.
Review the 3D plan, selections and itemized quote before signing.
Coordinate required approvals, deliveries and site protection.
Complete the agreed work, clean up and walk through the result.
Ready to plan the next step?
Send the scope, city, and timing. We’ll review the project and reply with the next step.
These whole-home figures are GTA market planning ranges in Canadian dollars, before HST, not a Capable price list. Your exact number follows a free estimate visit, free 3D design and a fixed, itemized quote for the agreed scope. We beat any written quote by 5% on the same scope. See the full-home renovation cost guide for examples and budget drivers.
Start with the changes that matter in daily use. If the layout and services already work, the budget can go into the kitchen, bathrooms, floors and finishes. Moving walls or services brings a different construction scope. Plan those connections before comparing prices room by room.
What can keep the scope simpler: retain a sound layout, useful cabinetry or finishes where appropriate; keep workable service locations; choose standard products that suit the rooms. If you phase the renovation, plan the connections first so one stage does not close access needed by the next.
What adds work: moving plumbing, opening structural walls, replacing major systems, correcting concealed damage and commissioning custom cabinetry or detailed finishes. A larger price needs an explanation of the work behind it, not just a package name.
A single kitchen, bathroom or basement needs its own scope and budget. Use the relevant guide below, then discuss the rooms and changes you want at your free estimate visit. Kitchen budget guide · Bathroom calculator · Basement calculator.
GTA market planning ranges start from about $100 per renovated sq ft for a finish-led whole-home update, around $175–$300 for more comprehensive work, and above $300 for structural or high-end renovations. An open 1,000 sq ft basement finish starts around $40,000, or about $40 per sq ft, without a bathroom. Benching starts around $38,000 and underpinning around $55,000, before finishing; full bathrooms from about $15,000. A small rear addition of about 250 sq ft has a construction planning starting point around $88,000, before drawings, engineering and permits.
Keeping a sound layout and services usually costs less than moving plumbing or opening structural walls. These are market references, not Capable prices or a quote for this property. Your exact number follows a free estimate visit and a defined scope. All prices in Canadian dollars, before HST unless stated.
See cost by house size · Basement renovation cost · Check a quote you already have
Your quote defines what is included
Get your fixed, itemized quote
Yes. Start with the rooms you want to change, what is not working and what you want to keep. Free 3D design and permit drawings before you sign help you review the proposed layout alongside the scope and price. A 3D view helps you picture the result; it does not replace engineering, a permit decision or the inspections your project requires.
Yes, both. Many homeowners want help planning the layout, choosing finishes, and seeing how the space will work before construction starts, especially for kitchen, bathroom, and main floor renovation projects in Milton. That front-end planning usually makes the build smoother and helps avoid expensive mid-project changes.
The most common projects are kitchen and bathroom renovations, basement finishing, main floor remodels, and whole home updates. A lot of Milton homeowners also look for better open-concept layouts, more functional family space, and modern finishes that feel consistent throughout the home. Those projects tend to add the most day-to-day value because they improve how the house actually works.
Milton says its online permit tool cannot process revision permits for approved permits or applications. Contact the permit administrator or the Town by email for changes. Keep the proposed revision and any related scope or price change clear before carrying out the affected work.
It depends on the size of the space, the level of finishes, and whether the work is cosmetic or involves plumbing, electrical, or structural changes. A kitchen, bathroom, basement, and full home renovation in Milton can all vary quite a bit, so the only useful number is a detailed quote based on your home and scope. For current pricing and budgeting guidance, visit pricing.
It is a planning reference for the scope named beside it. Keeping a workable layout and sound services can limit the work; moving plumbing, opening structure or correcting concealed damage can change it. The free estimate visit and necessary scope review establish what belongs in your fixed, itemized quote. A market starting figure is not a promise that every room or house can be renovated for that amount.
The biggest cost drivers are layout changes, material selections, hidden conditions behind walls, and whether permits or structural work are needed. Kitchens and bathrooms also tend to cost more per square foot because of plumbing, electrical, tile, and cabinetry. A good Milton home renovation contractor should spell out the scope, allowances, and change-order process so you can see what you’re actually paying for.
It varies by project, but planning, design, permits, material ordering, and construction all affect the timeline. A simple update can move much faster than a full home renovation in Milton with structural changes or custom finishes. The best approach is a written schedule with clear milestones, so you know what happens when and what could affect completion.
Compare the same rooms, materials and included work before comparing totals. Check allowances, exclusions, permit responsibilities, disposal and any conditions still awaiting investigation. We beat any written quote by 5% on the same scope. If the scopes differ, bring both: we can review the missing work and assumptions with you. You can also use our renovation quote review.
A clear quote should include the exact scope of work, what materials are included, any allowances, exclusions, permit responsibility, and how changes are priced. It should also show payment stages and explain what happens if hidden issues are found. That kind of detail is what helps prevent a quote from looking low upfront and growing later.
Yes, sometimes you do. In Milton, permits are commonly needed for structural work, plumbing or electrical changes, finished basements in some cases, and things like new window or door openings, and building without one can lead to a Stop Work Order. For permit-related details and process info, visit Ontario’s building-permit guide.
Sometimes renovating is the better move, especially if you like your location and the home just doesn’t fit your needs anymore. A Milton house renovation can give you a better layout, updated finishes, and more usable space without the cost and hassle of moving. The right choice usually comes down to the condition of the home, your budget, and how much change you want.
Compare the scope, not just the bottom-line number. Make sure each quote covers the same work, materials, allowances, permits, cleanup, and change-order process, because cheap quotes often leave out things that show up later as extras. A reliable Milton home renovation company should be able to explain the quote clearly and show similar completed work.
Yes, sometimes, but it depends on the size of the project and how much of the home is affected. For a kitchen, main floor renovation in Milton, or whole-home remodel, living on-site can be stressful if key areas are out of service for a while. Good planning, dust control, floor protection, and a realistic schedule make a big difference, but for larger projects some families choose to stay elsewhere temporarily.
They should be handled in writing before the extra work is done. That means you see the scope change, any cost impact, and any schedule impact before approving it. A professional renovation team won’t treat changes casually, because that’s how budgets get messy.
The most common issues are vague quotes, hidden damage, poor communication, and timelines that weren’t realistic to begin with. The best prevention is a detailed pre-assessment, a written scope, a clear schedule, and one point of contact during the project. That’s especially important for older homes, where outdated wiring, structural issues, or other surprises can affect the plan.
Yes, absolutely. Home renovation services in Milton have to follow the Ontario Building Code, and many projects also need municipal permits and inspections depending on the work involved. Local zoning, setbacks, lot coverage, grading, and drainage can also matter, especially if the renovation includes additions or structural exterior changes.
For busy homes, durable and easy-to-maintain finishes usually win over the most delicate options. Things like quality cabinetry, scratch-resistant flooring, solid surface counters, and moisture-resistant materials in bathrooms and basements tend to perform well over time. The best choice depends on how you use the space, not just how it looks in a showroom.
Yes. Those are some of the most requested home renovation services in Milton, along with kitchens, bathrooms, and full home remodels. If you’re opening up a main floor or updating an older home, it’s especially important to plan around structure, code, and how the finished space will tie into the rest of the house.
Ask for proof, not just promises. You should be able to verify liability insurance, WSIB clearance, and basic company information, and they should be comfortable showing past work and explaining their process. For insurance, licensing, and company details, visit about us.
You should expect the warranty terms to be clearly written and easy to review before you sign anything. Aftercare should also include a process for handling deficiencies or follow-up items once the project is complete. For current warranty details, visit warranty.
A GTA full home renovation often takes 6-12 months from design to move-in. See typical phase ranges and what can move the schedule.
Check records, structure, moisture, wiring, plumbing, HVAC, hazardous materials, radon, permits, and heritage status before finishes lock the plan.
Trace a basement leak before insulation, drywall or flooring. Learn what to document, which water paths to investigate, and when permits or specialist review may apply.
Compare basement paint colors with lighting, ceiling height, flooring, moisture, and family-room renovation scope in mind.
Planning a legal basement in Ontario? Check zoning, ceiling height, exits, fire separation, HVAC, plumbing, electrical and permit steps before design.
Explore our renovation services and project examples in nearby communities.
Milton’s permit guidance lists application forms for different types of renovation. A basement finish, an alteration and a secondary dwelling are different proposals to describe. Identify the intended use and service changes before preparing the application, then check the documents that belong with your project.
Your project can stay focused on the space you need to improve. Choose the route that matches the work:
For a project focused on the lower level, see basement renovation in Milton. Keep the basement plan connected to any work elsewhere in the house.
Start with the rooms you want to improve, even if you haven’t settled on a layout. Tell Yan, the owner, what you hope to change, your city, rough timing and budget. Bring any photos, plans or quote you already have; the first conversation is about defining the work and the next step toward your estimate.
Already have a quote? Bring it with the rooms you want to change and the parts you want to keep. Talk with Yan about the scope, the price and what Capable would put in writing for your home.
Get a clear estimate from a Milton home renovation contractor you can feel confident hiring.
Our quote itemizes the agreed work. If another quote covers a different scope, bring it—we can review the allowances, exclusions and missing work with you.
Free 3D design and permit drawings before you sign.
Yan answers calls and WhatsApp himself.
Get Your Free Renovation Estimate
We beat any quote by 5%.
Depends on your project, scope, site conditions, finishes, and what is already included.
Wait — before you go.