Full-home renovation
Plan the kitchen, bathrooms, adjoining rooms and finishes together, including what you want to keep.
WSIB & $5M+ insured.
Capable coordinates design, permits and construction, including underpinning when it is part of your agreed renovation scope.
Our quote itemizes the agreed work. If another quote covers a different scope, bring it—we can review the allowances, exclusions and missing work with you.
Planning a kitchen, bathroom or a larger renovation in King City? We define the rooms you want to change and what you want to keep. When the work connects several spaces, we coordinate the layout, permits, trades and finishes in one agreed scope. See how we plan a full-home renovation, explore whole-home budget ranges and review the full-home timeline.
Your home should support the way you live now, not force you to work around dated rooms, poor flow, or finishes that no longer fit the house. A thoughtful home renovation in King City can improve comfort, storage, and everyday function while bringing the quality of each space in line with the rest of your home. It is also a smart investment, with better layouts and durable upgrades that support long term value.
Our team manages King City home renovations from concept through construction, whether you need a main floor renovation, basement renovation, kitchen renovation, bathroom renovation, or a whole home remodel. We combine design guidance, detailed quoting, permit management, and site supervision so you do not have to coordinate trades yourself. With more than 25 years in the GTA and over 2,000 completed projects, we deliver high end finishes that suit the home and a process that stays accountable.
The first scope discussion should include the house and its site: the rooms to change, any addition, the existing services and what needs to remain accessible. Those connections can affect both the design and the order of work.
King Township says approvals from other departments or agencies may be needed before a building permit application. Identify which apply to your property early. A complete room plan still needs to fit the site and the applicable approval route.
25 years in the GTA · WSIB & $5M+ insured.
Start with one room, plan several rooms together, or renovate the whole home. Explore the work that fits your plans; the estimate will define what is included and what you want to keep.
Bring the kitchen, bathrooms and adjoining rooms into one plan. Decide what to keep, where the layout needs to change and which structural or service work connects the rooms. We coordinate design, permits and construction for the agreed scope, whether you build together or in phases.
Plan a whole-home budget →
Capable Group starts with the space you need and checks the lot, existing layout, structure, roofline, services and permit path before pricing the build seriously. The aim is an addition that connects properly to the home you want to keep, with the work and budget understood before the design goes too far.
Turn an underused lower level into living space that feels finished, bright, and comfortable. We handle layout planning, insulation, lighting, flooring, storage, and permit requirements so your basement can work as a family room, office, guest area, or flexible everyday space.
Estimate basement costs →
Basement renovation in King City →
Start with how you use the kitchen: preparation space, storage, appliance positions and lighting. Keep a layout that works, or plan the plumbing, electrical and adjoining-room changes needed for a new one. Cabinetry, counters and finishes belong in the same agreed scope.
Understand kitchen costs →
Plan the shower or bath, vanity, storage and lighting together with waterproofing and ventilation. Keeping workable fixture locations and moving plumbing are different scopes. We help define the room you want and the work behind the finished tile.
Estimate bathroom costs →
Comfort and approvals belong in the same renovation plan. Review insulation, air sealing, windows and doors alongside layouts and finishes. We help with drawings, permit applications and inspections for the agreed work, so those decisions are made before the affected construction starts.
A kitchen renovation can also affect the dining room, a stair or the services below it. Decide which connections belong in the work before choosing finishes: the rooms you keep matter as much as the rooms you change.
Capable Group brings 25 years of renovation experience to your King City project. We coordinate design, permits and construction for the agreed scope, with one contract, one schedule and one person to call. Free 3D design and permit drawings before you sign help you review the layout alongside a fixed, itemized quote. Start with one room or bring the whole-house plan; Yan, the owner, answers calls and WhatsApp himself.
Plan the kitchen, bathrooms, adjoining rooms and finishes together, including what you want to keep.
Basement renovation · Underpinning · Legal basement apartment
Start with the intended use and existing height. Review any floor lowering, finishing and apartment approval requirements as distinct parts of the scope.
Review the structure, foundations, roof connections and services before settling the drawings, permit and build plan.
Look at the rooms and connections you want to improve, then open the project for its photographs and scope. Each example identifies its actual location and stage of work.
See how completed Capable projects connect kitchens, bathrooms and adjoining rooms. Open a project to view its photos and the work involved.
Vaughan · Full-home renovation
Kitchen, living area, stairs, bathrooms and laundry shown in a completed Vaughan renovation.
The renovation carries through the kitchen and living area into bathrooms, laundry, storage and the stairs between spaces.
Glass-shower, tub and vanity layouts, with powder-room and laundry details from a completed Vaughan project.
Kitchen, dining, living spaces, stairs and bathrooms connected by wood, black and white finishes.
Toronto · Full-home renovation
The completed renovation includes the kitchen, several bathrooms, the entrance, an upper terrace and a covered outdoor living area.
Mississauga · Full-home renovation
The completed work includes the kitchen, living and dining areas, bathrooms, basement rooms and front entry.
You are choosing who will open up your home, manage the work and see it through. Compare the commitments behind the price: what you will receive, when decisions are made, and who remains responsible.
Capable Group
What to expect
Our quote itemizes the agreed work. If another quote covers a different scope, bring it—we can review the allowances, exclusions and missing work with you.
Compare the same materials, allowances and exclusions before deciding which quote offers better value.
Picture the proposed rooms and review the design alongside the scope and price.
Check the proposed layout and room connections while changes can still be made on the plan.
Read the coverage and claim conditions with your agreement. Electrical issues have two-year coverage. Notice: To file a warranty claim, a $350 deposit is required. If the issue is covered by our warranty, this amount will be refunded to you. View warranty coverage and claims.
Know what is covered and whether that protection can stay with the house.
One project lead keeps the schedule and decisions connected.
Use the written schedule and photo updates to understand the current stage and decisions coming next.
Review the payment schedule alongside the agreed scope before signing.
Match each payment to its agreed stage and review the finished work at your walkthrough.
Capable coordinates design, permits and construction, including underpinning when it is part of your agreed renovation scope.
Discuss changes with the team coordinating the adjoining rooms and trades.
We identify what needs further investigation before the affected work is finalized, so the scope addresses more than the finished surfaces.
Understand what needs investigation before choosing finishes that could conceal the problem.
Yan answers calls and WhatsApp himself.
Bring questions about the scope, price or progress directly to Yan.
Choose from pot lights, a heated bathroom floor, upgraded tile or a closet build-out. The offer has no expiry date.
Review the eligible choices alongside your renovation scope before selecting the upgrade.
Send the scope, city, and timing. We’ll review the project and reply with the next step before you book.
Recognized by Global Media
A homeowner’s experience
“They updated our kitchen and three bathrooms.” — Lois, April 3, 2025
5★ Rated on Google
Posted on Google Marc MuehlethalerTrustindex verifies that the original source of the review is Google. Great experience. Recently did my 1200 square foot basement. Stress free experience. Accurate quote. Great communication and on time with good quality. Love our new space.Posted on Google Becky SherlockTrustindex verifies that the original source of the review is Google. The Capable Group did a wonderful job renovating our 100 year old basement! All of the workers sent to my home were competent in their trades and professional to deal with. The project manager and site supervisor were responsive to questions and very helpful. What started out as a basement refinishing project ended up requiring some underpinning, waterproofing and structural reinforcement. The Capable Group team was able to handle the expanded scope and completed the job within the agreed to budget!Posted on Google Tee Alexandria CampbellTrustindex verifies that the original source of the review is Google. Nazar and his team did a fantastic job! I would recommend them to anyone!Posted on Google Rita FinchTrustindex verifies that the original source of the review is Google. The kitchen remodeling services provided by Capable Group Inc. exceeded my expectations. They skillfully adjusted the arrangement, improving its functionality and flow. My kitchen now looks more streamlined and modern thanks to the custom countertop and cabinet options.Posted on Google Trevpr RobertsTrustindex verifies that the original source of the review is Google. Owing to spatial constraints, I managed to obtain just what I required from them. They carefully considered how to make the greatest use of the limited area, how to add mirrors, and how to make sure the flooring was suitable for my purposes before transforming my basement into an amazing fitness center. Their help allowed me to purchase the gym of my dreams.Posted on Google Virginina TechTrustindex verifies that the original source of the review is Google. I just wanted to say thank you for the fantastic basement makeover that Capable Group Inc. completed! They've made it into the perfect place to hang out and host parties. I think their efforts and abilities are very amazing. You guys did a fantastic job!Posted on Google Archie SandersTrustindex verifies that the original source of the review is Google. I adore having a home gym, but I ran out of room. Capable Groups made the most of the available space, updated the flooring, and added mirrors to turn my basement into a terrific workout area. I now own the home gym of my dreams!Posted on Google Richa KhuranaTrustindex verifies that the original source of the review is Google. We did our basement finishing from Capable group. It was seamless process and they were very professional.Posted on Google Conner DrewTrustindex verifies that the original source of the review is Google. We are grateful to Capable Group Inc. for the wonderful basement makeover. The space was transformed entirely, making it a fantastic place to host events and chill out with friends. I must say, their skills and commitment are really impressive. Fantastic work, gentlemen!Verified by TrustindexTrustindex verified badge is the Universal Symbol of Trust. Only the greatest companies can get the verified badge who has a review score above 4.5, based on customer reviews over the past 12 months. Read more
Discuss the rooms, inspect the home and define the work.
Review the 3D plan, selections and itemized quote before signing.
Coordinate required approvals, deliveries and site protection.
Complete the agreed work, clean up and walk through the result.
Ready to plan the next step?
Send the scope, city, and timing. We’ll review the project and reply with the next step.
These whole-home figures are GTA market planning ranges in Canadian dollars, before HST, not a Capable price list. Your exact number follows a free estimate visit, free 3D design and a fixed, itemized quote for the agreed scope. We beat any written quote by 5% on the same scope. See the full-home renovation cost guide for examples and budget drivers.
Start with the changes that matter in daily use. If the layout and services already work, the budget can go into the kitchen, bathrooms, floors and finishes. Moving walls or services brings a different construction scope. Plan those connections before comparing prices room by room.
What can keep the scope simpler: retain a sound layout, useful cabinetry or finishes where appropriate; keep workable service locations; choose standard products that suit the rooms. If you phase the renovation, plan the connections first so one stage does not close access needed by the next.
What adds work: moving plumbing, opening structural walls, replacing major systems, correcting concealed damage and commissioning custom cabinetry or detailed finishes. A larger price needs an explanation of the work behind it, not just a package name.
A single kitchen, bathroom or basement needs its own scope and budget. Use the relevant guide below, then discuss the rooms and changes you want at your free estimate visit. Kitchen budget guide · Bathroom calculator · Basement calculator.
GTA market planning ranges start from about $100 per renovated sq ft for a finish-led whole-home update, around $175–$300 for more comprehensive work, and above $300 for structural or high-end renovations. An open 1,000 sq ft basement finish starts around $40,000, or about $40 per sq ft, without a bathroom. Benching starts around $38,000 and underpinning around $55,000, before finishing; full bathrooms from about $15,000. A small rear addition of about 250 sq ft has a construction planning starting point around $88,000, before drawings, engineering and permits.
Keeping a sound layout and services usually costs less than moving plumbing or opening structural walls. These are market references, not Capable prices or a quote for this property. Your exact number follows a free estimate visit and a defined scope. All prices in Canadian dollars, before HST unless stated.
See cost by house size · Basement renovation cost · Check a quote you already have
Your quote defines what is included
Get your fixed, itemized quote
We handle most residential renovation work, including full home renovation in King City, kitchens, bathrooms, basements, main floors, additions, and interior reconfigurations. That includes both cosmetic upgrades and more complex projects involving structural work, permits, and multiple trades. If you’re planning a custom home renovation in King City, we can help scope it properly from the start.
Yes. Start with the rooms you want to change, what is not working and what you want to keep. Free 3D design and permit drawings before you sign help you review the proposed layout alongside the scope and price. A 3D view helps you picture the result; it does not replace engineering, a permit decision or the inspections your project requires.
No. King Township advises that other agency or departmental approvals may be required before applying for the building permit. Confirm the applicable requirements for the property and the proposed work, rather than assuming the building application replaces them. Its permit guidance links to the relevant applicable-law resources.
It depends on the size of the space, the scope of work, and the finish level you want. Kitchen, bathroom, basement, and whole home remodel costs can vary a lot, so the best next step is a detailed assessment rather than a rough guess. For current pricing information, visit pricing.
It is a planning reference for the scope named beside it. Keeping a workable layout and sound services can limit the work; moving plumbing, opening structure or correcting concealed damage can change it. The free estimate visit and necessary scope review establish what belongs in your fixed, itemized quote. A market starting figure is not a promise that every room or house can be renovated for that amount.
Compare the same rooms, materials and included work before comparing totals. Check allowances, exclusions, permit responsibilities, disposal and any conditions still awaiting investigation. We beat any written quote by 5% on the same scope. If the scopes differ, bring both: we can review the missing work and assumptions with you. You can also use our renovation quote review.
Yes. A detailed quote should clearly break down the scope, materials, allowances, and exclusions so you know what you’re actually approving. We also do a pre-assessment for hidden issues before quoting, which helps reduce surprise costs once the project starts.
A full home renovation timeline depends on the home’s size, the amount of structural work, permit requirements, and product selections. Smaller projects move faster, while a whole home remodel in King City with major layout changes takes longer. The best way to get a realistic timeline is during planning, once the scope is fully defined.
Yes. We manage the renovation from start to finish, including trades, scheduling, coordination, and day-to-day site supervision. That means you don’t have to chase different subcontractors or try to manage the job yourself.
Yes. It’s common to combine a kitchen renovation in King City with bathrooms, basement finishing, or a main floor renovation as part of one larger plan. Bundling the work usually makes scheduling, design consistency, and overall project management much easier.
Sometimes, yes. Permits are often required when the work affects structure, plumbing, electrical, insulation, layouts, or additions, and King City projects can also involve extra review depending on the property and local conservation rules. We handle permit coordination and paperwork as part of the process; for more about permits and renovation process details, visit Ontario’s building-permit guide.
The biggest factors are clear planning, trade coordination, early material ordering, and regular communication. In an occupied home, it also helps to phase the work so key spaces stay usable when possible. Weekly updates and active site supervision make it easier to catch issues before they turn into delays.
It usually starts with a walkthrough, project planning, and a detailed quote based on the actual scope of work. From there, the process can include design, 3D previews, pre-construction review, permits, scheduling, construction, site cleanup, and a final walkthrough. The goal is a managed renovation without leaving you to coordinate all the moving parts.
We use dust barriers, floor protection, controlled work zones, and daily cleanup to keep the rest of the home as protected as possible. In occupied homes, that matters a lot because the jobsite can’t just spill into every room. A clean, organized site also helps reduce stress and prevent avoidable damage.
Yes. A good King City renovation contractor should be able to match the finish level, trim details, layout flow, and overall character of the home instead of making the new work look out of place. That matters even more in higher-end homes where rushed or generic finishes stand out right away.
A standard remodel usually follows a more straightforward scope with common layouts, materials, and construction details. A custom home renovation in King City is more tailored to the home and the way you live, often involving unique design choices, built-ins, structural changes, and higher-end finish work. Custom work takes more planning, but it gives you a result that feels more intentional.
Yes. Older homes can hide outdated wiring, plumbing issues, uneven framing, insulation gaps, moisture problems, or structural changes from past work. That’s why a proper pre-assessment matters before finalizing a quote for home renovation services in King City.
They can add time, especially when work needs permits, staged inspections, or revisions to the approved scope. Code-required updates also sometimes come up once walls or floors are opened. Change orders are part of renovation reality, but keeping them documented and approved quickly helps avoid bigger scheduling problems.
Yes, warranty coverage and aftercare are available after completion. Since warranty terms can change by project and scope, the best place to review current coverage is warranty. If you want specifics for your renovation, it’s worth asking during the quote stage.
A GTA full home renovation often takes 6-12 months from design to move-in. See typical phase ranges and what can move the schedule.
Check records, structure, moisture, wiring, plumbing, HVAC, hazardous materials, radon, permits, and heritage status before finishes lock the plan.
Trace a basement leak before insulation, drywall or flooring. Learn what to document, which water paths to investigate, and when permits or specialist review may apply.
Compare basement paint colors with lighting, ceiling height, flooring, moisture, and family-room renovation scope in mind.
Planning a legal basement in Ontario? Check zoning, ceiling height, exits, fire separation, HVAC, plumbing, electrical and permit steps before design.
Explore our renovation services and project examples in nearby communities.
King Township’s permit guidance distinguishes work requiring a permit from work that does not. Use the proposed changes to your King City home as the starting point: explain what stays, what will be removed and what will be added. Check the application requirements before the design is treated as ready to build.
Your project can stay focused on the space you need to improve. Choose the route that matches the work:
For a project focused on the lower level, see basement renovation in King City. Keep the basement plan connected to any work elsewhere in the house.
Start with the rooms you want to improve, even if you haven’t settled on a layout. Tell Yan, the owner, what you hope to change, your city, rough timing and budget. Bring any photos, plans or quote you already have; the first conversation is about defining the work and the next step toward your estimate.
Already have a quote? Bring it with the rooms you want to change and the parts you want to keep. Talk with Yan about the scope, the price and what Capable would put in writing for your home.
Book a walkthrough with a King City renovation contractor and get honest pricing before you commit.
Our quote itemizes the agreed work. If another quote covers a different scope, bring it—we can review the allowances, exclusions and missing work with you.
Free 3D design and permit drawings before you sign.
Yan answers calls and WhatsApp himself.
Get Your Free Renovation Estimate
We beat any quote by 5%.
Depends on your project, scope, site conditions, finishes, and what is already included.
Wait — before you go.