Completed Capable Group project · Vaughan
Vaughan Bathroom Renovation
This Vaughan archive contains several wet rooms: a glass-shower bathroom, a tub-and-shower bathroom, a powder room and nearby laundry storage. Planning them together can reduce repeated demolition and trade visits, but every room still needs its own measurements, drainage, ventilation and access.
The completed project
Bathrooms and laundry share the same service plan
The finished archive shows several bathroom layouts: a glass shower and vanity, a tub-and-shower arrangement, a compact powder room and a nearby laundry area. These spaces share plumbing, ventilation, electrical loads, storage needs and finish junctions, so planning them together can reduce conflicts and repeated work.
Use one coordinated room schedule for fixtures, drains, ventilation, electrical, cabinetry and tile. Keep each room visually distinct only after the service plan and practical clearances are resolved.
Tub or glass shower, vanity storage, tile, lighting and ventilation.
Compact fixture planning and a simpler high-use finish package.
Appliance clearances, drains, shutoffs, cabinetry and service access near wet rooms.
Before construction
What to coordinate across bathrooms and laundry
List every fixture, appliance, fan, outlet and heated-floor load, then verify floor conditions, maintenance access and ordered-product dimensions before work begins.
- List every wet-room load.Record fixtures, appliances, fans, heated floors, outlets and lighting before confirming electrical and plumbing capacity.
- Verify floor and wall conditions.Check level, framing, moisture history and the build-up required for tile and waterproofing.
- Protect maintenance access.Plan access to shutoffs, traps, cleanouts, laundry connections and equipment after cabinetry is installed.
- Coordinate ordered products.Use approved dimensions for tubs, valves, glass, vanities, toilets, appliances and cabinets.
- Sequence shared trades once.Group demolition, rough-ins, inspections and finish work so completed rooms do not need to be reopened.
01 · Main bathrooms
Choose the shower or tub arrangement from real dimensions
The archive shows both a walk-in shower and a tub-based layout. The better option depends on household needs, room dimensions, drain location, entry clearance and maintenance—not the photograph alone.
Work involved
- Measure the room after accounting for wall and tile build-ups.
- Confirm drain, supply, valve and ventilation routes before ordering fixtures.
- Specify waterproofing, wall backing, niches and glass attachment points.
- Coordinate vanity drawers, doors, mirrors, lighting and outlets.
What changes the cost
The biggest budget variables here are changing fixture locations, custom glass, cabinetry and countertop, tile complexity and substrate work, and ventilation, electrical or hidden moisture correction.
02 · Powder room and laundry
Keep compact service rooms clear and maintainable
Small rooms become difficult when doors, appliances, cabinets and service access compete. A simple plan with deliberate storage usually performs better than filling every wall.
Work involved
- Check door swings and required appliance and fixture clearances.
- Plan leak protection, shutoffs, drain access and ventilation.
- Provide countertop and storage without blocking hookups or maintenance.
- Use durable finishes at splash, floor and appliance-contact areas.
What changes the cost
Costs in this part of the project are most sensitive to laundry plumbing and electrical relocation, custom storage and countertop, floor correction and water-resistant finishes, and tight access and multi-room sequencing.
More project photos
The remaining views connect bathrooms and laundry
Together, the photographs show different fixture layouts, storage needs and service junctions that belong in one coordinated scope.
Work sequence
Typical work sequence
The work normally moves from room surveys and fixture planning through shared demolition, rough-ins, waterproofing, finishes and final testing.
- 1. Existing-condition surveyMeasure the room and record visible moisture, structure, plumbing, electrical, ventilation and access.
- 2. Layout and selectionsApprove fixture dimensions, clearances, elevations, tile limits, storage and permit triggers.
- 3. Protection and demolitionProtect the route to the room, isolate dust and open the approved scope to verify concealed conditions.
- 4. Rough-ins and wet-room assemblyComplete plumbing, electrical, ventilation, backing, subfloor, waterproofing and required inspections.
- 5. Finishes and testingInstall tile, cabinetry, glass, fixtures, lighting and accessories, then test drainage, ventilation and final operation.
2026 Toronto and GTA market range
What could several wet rooms cost to renovate?
This Canadian-dollar market range is an early planning reference. It is not the historical price of this Vaughan project and not a Capable Group quote.
The lower end assumes a contained full-room scope. Plumbing relocation, custom glass, premium fixtures, detailed tile and repairs behind finishes can move the total higher.
A useful estimate should state design, demolition, labour, materials, fixtures or appliances, permits, tax, allowances, exclusions, protection, disposal and the method for handling concealed conditions.
Timing
How long could the work take?
A full bathroom commonly needs about two to four weeks of active construction after design, ordering and any permits. Custom glass, detailed tile, inspections and concealed repairs can extend the calendar.
Permit check
Could this work require a permit?
Possibly. A finish-only update can follow a different path from plumbing relocation, structural work or a new room. Confirm the proposed work with Vaughan Building Standards before construction starts.
Before requesting an estimate
Questions to settle before pricing bathrooms and laundry
Should several wet rooms be renovated together?
It can reduce repeated demolition, plumbing, electrical and trade visits. Each room still needs its own layout, waterproofing, ventilation and access plan.
Which products control the rough-ins?
Tubs, shower valves, toilets, vanities, faucets, laundry appliances and floor-heating systems can control drain, supply, electrical and wall locations. Approve their dimensions early.
Can one bathroom remain usable during the work?
Sometimes. The schedule must protect a complete working bathroom and safe access to it. Shared shutoffs or drain work can still cause planned interruptions.
What should we send for an initial review?
Send photographs and approximate dimensions for every affected bathroom and laundry area, plus known moisture or service problems, city and rough timing.
Your project
Planning bathroom work in Vaughan?
Send photos of every bathroom or laundry area involved, note which fixtures should stay or move, and include your rough timing. We will review the shared service scope.
Include appliance connections, shutoffs, ventilation, floors and the access between rooms.
View Capable Group’s bathroom renovation service →