Whole-home renovation in Toronto & the GTA
Home Renovation in Toronto, Planned and Priced as One Project
The house you’d move for, without moving. One team renovates it top to bottom, with one fixed price in writing for the agreed scope and a finish date in writing.
Full home renovations and custom home renovations across Toronto and the GTA, from design-build planning to the final walkthrough.
No-obligation scope review by Toronto building-code experts. Yan replies himself, then we visit for free and send a fixed, itemized quote.
- One fixed price itemized, one team
- Free 3D design worth $1,000+2
- Free permit drawings prepared with your scope
“They updated our kitchen and three bathrooms.”
Lois · Kitchen and bathroom renovation · April 3, 2025“The renovations they did to our bathroom truly make it stand out, and the new kitchen looks fantastic.”
Doris · Kitchen and bathroomChosen by 2,000+ homeowners across Toronto & the GTA
- $5M+ liability insured & WSIB coveredIf someone gets hurt or your house gets damaged, our coverage pays, not you. Both certificates in your hand at the first visit.
- Legal code specialistsFire separation, egress windows, zoning — done legally.
- One fixed price, in writingItemized line by line before you sign. The price we sign is the price you pay. Nothing is added without your signature. Got a cheaper written quote? We go 5% under it3.
What you get when you work with us
Six things on every project, written into your agreement.
One fixed, itemized price
One team, one price for the whole house. The price we sign is the price you pay. Nothing is added without your signature.
Free 3D design
See every room before you pay for the build.
Free permit drawings
We draw it, file the permit and book every inspection.
Lifetime workmanship warranty
Covered for life, and it moves with the house if you sell.
$1,000 upgrade on us
Pot lights, a heated bathroom floor, upgraded tile or a closet.
5% below any written quote3
Got a cheaper written quote? We line the two up with you at the free visit and go 5% under it.
Whole homes we renovated in Toronto and the GTA
Kitchens, bathrooms, main floors and basements, planned and built as one project.
“They skillfully adjusted the arrangement, improving its functionality and flow.”
What does a whole-home renovation cost in Toronto?
The price depends on the work, not just the size of the house. These are GTA market ranges in Canadian dollars, before HST.
New finishes in the agreed rooms, keeping a workable layout and sound services.
Broader room changes, kitchen and bathroom rebuilding, and the plumbing and electrical the plan needs.
Structural openings, major system changes or a more demanding finish package.
Basement apartment: from about $55,000 when the height and entrance already work. Your fixed, itemized quote follows the free visit.
Some of the cost may come back through a federal family-suite tax credit, Ontario insulation and window rebates, and up to $6,650 from Toronto for eligible flood-protection work, subject to program conditions and funding.
“Capable made our home renovation smooth and stress-free. Everything was delivered on time and within budget, with clear communication and great attention to detail.”
What a Toronto renovation quote should include
Line by line, every dollar named. Put any other quote next to ours and you’ll see what it leaves out. Got a cheaper written quote? We go 5% under it for the same scope and materials.3
Scope, drawings, and permits
Clear plans, drawings, and permit assumptions are what stop a quote from changing shape halfway through the job.
Plumbing, electrical, and HVAC work
Bathrooms, kitchens, laundry, or layout changes often trigger plumbing, electrical, and HVAC work that must be priced honestly from the start.
Demolition, disposal, and prep
Demolition, disposal, framing adjustments, leveling, and hidden repair prep are common areas where low quotes miss real work.
Finish level and allowances
Finish quality matters, but so do material allowances. A realistic quote explains what grade of flooring, tile, fixtures, and trim is actually included.
Timeline, trade sequencing, and access
Schedule reliability depends on approvals, material ordering, trade coordination, and site access, not just on a promised finish date.
Warranty, exclusions, and change orders
A good renovation quote explains warranty coverage, what is excluded, and how change orders are handled if hidden conditions show up later.
Money back you may qualify for in Toronto
Programs that can return part of what you spend. We help you claim them.
Home Renovation Savings Program, with two or more upgrades and a home energy assessment. Plus $100 per window or door opening.
Eligible backwater valve, sump pump and related work, subject to City requirements and annual funding.
A self-contained suite for a senior, or an adult relative eligible for the disability tax credit, with qualifying work completed in 2026.
Each program decides who qualifies and pays the money itself. Amounts as published by each program; checked November 6, 2026. Terms below.
What GTA homeowners say about Capable Group
The whole house, one contract
Custom home renovations: plan the whole house before opening the first room
Four phases, one team, one fixed price for the agreed scope. You see the whole plan and price before any wall is opened.
1
Design and permits
3D design, drawings and the permit application for the whole house, priced as one scope.
You stay in the house2
Structure and systems
Walls, structure, plumbing, electrical and HVAC — everything behind the walls, in the right order.
Stay or move out: we plan it with you3
Kitchen and bathrooms
The rooms that take longest, built while the rest of the house is protected.
Written schedule for each room4
Finishes and walkthrough
Floors, trim, paint and fixtures, then a walkthrough. Final payment after it.
Lifetime workmanship warranty1
“They updated our kitchen and three bathrooms.”
From your first visit to the final walkthrough
- 01
Visit and scope
We inspect the home and check moisture and structure before quoting.
- 02
Design and fixed quote
3D plan, materials and an itemized quote with payment stages and a written schedule.
- 03
Permits and preparation
Drawings, approvals, inspections, dust barriers and floor protection.
- 04
Build and walkthrough
One project lead runs the trades. Final payment follows your walkthrough.
Your part: approve the 3D design, sign one fixed quote, read the Friday photo report, and walk through the finished rooms with us.
Yan answers calls and WhatsApp himself. We start four projects a month.
Why Toronto homeowners trust Capable with the whole house
$5M insurance and WSIB
WSIB on every worker. If someone gets hurt or your house gets damaged, our coverage pays, not you. Both certificates in your hand at the first visit.
25 years, 2,000+ projects
Whole homes, kitchens, bathrooms and basements across the GTA.
One project lead
Your single contact, with a Friday photo report.
Pay as the work gets done
No big deposit. Final payment after your walkthrough.
Woodbridge showroom
See materials and finishes in person.
In-house millwork
Cabinetry and built-ins made by our own team.
Now booking December starts. We only take 4 projects a month.
Your full home renovation, start to finish, in plain words
Six short answers before the details. Every one of them is written into your quote.
What you are buying
The whole house is planned and priced as one project: kitchen, bathrooms, floors, basement, walls that move. One renovation company does the design, the permits and the build, from a simple update to an upscale remodeling of every room.
The entry price
From about $100 per renovated sq ft, about $100,000 for 1,000 sq ft. That is a finish-led update: new finishes in the layout you have. Your exact price comes in a fixed, itemized quote after a free visit.
Before you sign
Free 3D design (worth $1,000+2), so you see the rooms before you pay for them. Free permit drawings, and we take the permit through the city for you. The first visit is free too.
How long, and who tells you
You get the weeks for your scope with your quote. Your finish date is written into the contract. Every Friday you get a photo report, so you never have to ask what happened this week.
If something goes wrong
One fixed, itemized price for the agreed scope. You pay in stages, as the work gets done. Lifetime workmanship warranty, in writing1. $5M insurance and WSIB.
If you need more
Not ready for the whole house? Start with one room and keep the same plan: kitchen renovation, bathroom renovation or finishing your basement. Need more space than the house has? See a home addition.
Planning a whole-home renovation: the details
What to decide first, how long each stage takes, what Toronto permits change, and what to check in any quote before you sign.
Plan the connections between rooms alongside the rooms themselves. Flooring transitions, doorways, stairs, cabinetry and shared services can affect several areas at once. Capable connects your priorities to a coordinated layout and construction scope, so the estimate can show how those decisions work across the home.
Decide what changes—and what stays
Your renovation can cover the main floor, several connected rooms or the whole house. Start with the spaces you want to improve, then identify the layouts, features and finishes worth keeping.
Capable brings 25 years of renovation experience to Toronto and GTA projects. A free estimate visit helps establish what needs investigation and what belongs in the quote, with free 3D design and an itemized fixed quote.
Connect the layout to the work behind it
Coordinate the build around your home
Planning rooms together
For example, an island affects the passage into the dining area and access to appliances. A new floor meets existing doors, stairs and adjoining rooms. Those are useful design checks because approving each item separately can leave a conflict for the installation stage.
Start by explaining the change you need in daily use: a kitchen that is easier to move through, bathrooms with useful storage, or rooms that connect more naturally. Then identify what can stay. The full-home planning guide helps put those decisions in order before finishes and custom orders lock the scope.
Does the entire house need to be stripped out?
The scope should follow the condition of the house and the change you want. A coordinated whole-home renovation can retain sound elements. Structural alterations, damaged assemblies or unsuitable services mean more opening and replacement. We look behind the walls before we price, so you know whether it is a finish update or a full gut before you sign.
An older Toronto house deserves particular attention before expensive surfaces are selected. Records, visible condition, structure and building systems can reveal questions requiring professional assessment. A freshly decorated room cannot tell you everything about what is concealed behind it. Our older-house renovation guide explains the investigations to consider.
If a decision remains unresolved, show it in the scope rather than relying on an assumption. That lets you compare the cost of retaining an element with the work needed to replace it, and makes the boundary of the fixed quote easier to understand.
Renovating in stages? We plan the connections before the first room is finished, because new plumbing or wiring for a later phase may need to pass through it. We set which services, openings and access routes to prepare now, and which work can wait. Our whole-home planning guide explains how to compare one coordinated build with work in phases.
How long does a whole-home renovation take?
Our published planning guide gives 6–12 months from design start to move-in for a GTA full-home renovation. It describes 2–4 months for design and permits together and 3–8 months for construction. These are early planning ranges for their stated phases, not a guaranteed completion date. Full-home renovation timeline.
The design-and-permit figure is one combined phase. It does not establish a separate two-to-four-month allowance for each activity. Nor should the endpoints of the phase ranges be added to create a promised total. Finish-led work can be quicker. A full gut, addition, underpinning, major systems replacement or difficult discovery in an older house may need twelve months or more.
Capable plans starts around approvals, materials, trades, access and current capacity. Before you accept a schedule, we show you which decisions must be made, which products need ordering, what could change the sequence and how your household uses the house while the work is underway. Your finish date goes in your schedule before you sign.
Does Toronto's review clock tell you when building can start?
A municipal review clock describes part of the approval process. Toronto publishes a 10-business-day review standard for complete applications in its House Stream, covering specified houses with no more than two dwelling units. The actual project must meet the stream's conditions. Toronto permit review streams.
Eligible interior projects may fit Toronto's Express stream, which has a three-business-day review goal after intake. Residential additions are excluded. A review can produce comments or require further information, so either figure should be kept separate from permit issuance, design preparation and construction. We check your scope against Express eligibility for you.
This is why permit questions belong before a start date is fixed. Capable flags structure, plumbing, electrical and legal-suite questions during scope planning. If your whole-home project includes an addition or basement apartment, identify that work explicitly rather than assuming a general interior-renovation approval covers it.
See your home planned as one project
Start with a free estimate visit. We walk the house with you, take your ideas, drawings or another quote, and plan the connected scope as one project.Yan Margulis
Owner, Capable Group
Yan answers calls and WhatsApp himself. We start four projects a month.
- Itemized fixed quote before you sign
- $5 million liability insurance
- 25 years renovating GTA homes
Finish date in writing
Permits, ordering and trades are planned around the agreed scope and construction sequence.
Lifetime workmanship warranty
Covered for life, in writing, and it moves to the next owner if you sell1.
A $350 deposit is required to file a claim and is refunded if the issue is covered by the warranty. View warranty coverage and claims.
5% under any written quote
Got a cheaper written quote? We line it up with ours for the same scope and materials, then go 5% under it3.
Free 3D design
See how the connected rooms work before agreeing the finishes and construction scope.
What we see missing in other quotes
Unsupported timelines
A schedule that ignores permits, materials, site access, and trade sequencing is not a real plan.
Unclear warranty language
A warranty is less useful if coverage, exclusions, and responsibility are not explained.
Allowance-heavy pricing
Low quotes often hide permit, disposal, prep, or finish allowances that change later.
Thin design support
A sketch is not enough when layout, finishes, and fixtures are still undecided.
Pay as the work gets done
No big deposit. Milestone payments are tied to finished stages.
Final payment comes after your walkthrough. Every payment is tied to a finished stage in your written schedule.
$1,000 upgrade on us
A free $1,000 upgrade on signed projects over $40,000.
Choose from pot lights, a heated bathroom floor, upgraded tile or a closet build-out. The offer has no expiry date.
- Discuss the project. Share the house, rooms, priorities and budget band by call or WhatsApp.
- Free estimate visit. We look behind the walls before we price: what can stay, and what needs structural or services work.
- Design and itemized quote. We develop the layout in 3D and put included work, allowances and exclusions in writing.
- Drawings and permits. We prepare the drawings, submit the permit and answer the examiner’s questions, then set build dates around the review.
- Build and walkthrough. One project lead runs the build. Every change is priced in writing before you approve it, and we walk the finished rooms with you.
Plan and price
Photos, rooms involved, city, timing, budget range, and quote gaps.
Design and materials
Layout, finish decisions, drawings, and ordering plan where needed.
Permits and prep
Permit needs, trade coordination, access, site protection, and material lead times.
Build and clean
Managed trades, site protection, progress updates, cleanup, and handover.
GTA market planning ranges depend on the work, not just the size of the house:
- Finish-led update: from about $100 per renovated square foot. A lighter scope that retains more of the existing layout and systems.
- Comprehensive renovation: from about $175 per renovated square foot.
- Structural or high-end transformation: from about $300 per renovated square foot. Price the work against drawings.
All prices in Canadian dollars, before HST unless stated. Your quote depends on the confirmed scope. Our full-home cost guide shows starting examples by house size and the scope behind those numbers. For early planning, use the renovation cost calculators.
What changes the budget? Use the area actually being renovated. Keeping a suitable kitchen footprint, sound services and usable finishes can reduce the work. Moving plumbing, opening structural walls, replacing systems or commissioning custom cabinetry adds responsibilities and cost.
What needs a separate check? Our quote names design, engineering, permits, appliances, HST and every exclusion, so you see what other figures leave out. Accommodation, exterior work, concealed repairs and contingency need their own budget decisions.
- Detailed quote review
- Start-to-finish customer support
Money back on the table: a federal tax credit of up to $7,000 for a qualifying family suite completed in 2026, Ontario insulation and window rebates, and Toronto's flood-protection subsidy of up to $6,650 per property, when your project qualifies. We find the ones that fit and put them in your quote. See what applies →
Keep the budget clear as decisions change
The scope comes first. We itemize the confirmed work against your drawings and selections, with allowances, exclusions and how concealed repairs are handled, in writing.
Price a change before you approve it. A moved fixture or new finish can affect other rooms and trades. We price it in writing first, with its schedule impact, and you decide. Nothing is added without your signature.
Keep decisions visible. One project lead runs your job and records every approval. Payment stages, the lifetime warranty1, $5M+ insurance and WSIB are in writing before work begins.
See how the rooms come together
A kitchen photo shows one part of the work. These completed projects show how kitchens, bathrooms, living spaces and, in Mississauga, the basement fit into a wider renovation. Open a case to see the rooms, details and project photographs together.
Kitchen · Bathrooms · Shared living space
Richmond Hill: open kitchen and family rooms
Skylights, an island and garden doors connect the kitchen, dining and family room. The case also shows a bedroom, primary bathroom and powder rooms.
View the open-concept project →Kitchen · Bathrooms · Laundry and stairs
Vaughan: kitchen, bathrooms and laundry
The renovation carries through the kitchen and living area into bathrooms, laundry, storage and the stairs between spaces.
View the Vaughan project →Kitchen · Bathrooms · Dining and living
Richmond Hill: one material plan across the home
Wood, black and white finishes connect the kitchen, dining and living areas with the staircase, full bathroom and powder room.
View the Richmond Hill interior project →Kitchen · Bathrooms · Basement
Mississauga: main floor and basement
The kitchen, living and dining areas connect with bathrooms, a basement family room and office, and the covered entry. The case explains how ceiling height, moisture and services affect basement planning alongside the rooms upstairs.
View the Mississauga project →Planning your own combination? Explore kitchen renovations, bathroom renovations and basement renovations. If the existing house needs more floor area, compare home additions as part of the wider scope.
From homeowner reviews
“They updated our kitchen and three bathrooms.” — Lois, April 3, 2025
“The renovations they did to our bathroom truly make it stand out, and the new kitchen looks fantastic.” — Doris, April 30, 2025
Renovating in phases?
We plan the full scope before the first phase starts, including future service routes and finish junctions. You know which rooms you keep: before day one we agree the work zones, how they’re sealed off and the order of the work. That decides whether you can stay at home during construction.
Included in every quote
- Design and 3D renderings
- Architect fees and drawings
- Materials and labour
- Garbage bin and disposal
- Post-construction cleaning
Not added to your invoice
- Structural fees that were not in the signed scope
- Travel time costs
- Administrative markups
- Overtime charges
If opening a wall shows a hidden condition, we price the fix as a written change order and you approve it before the work continues.
Inclusions, allowances and exclusions, written before you sign.
- Scope reviewed before final pricing
- Design and material decisions clarified
- Warranty and schedule terms explained
$5M+ insured & WSIB
WSIB on every worker. If someone gets hurt or your house gets damaged, our coverage pays, not you. Both certificates in your hand at the first visit.
Permit & code planning
We flag permit, structure, plumbing, electrical, and legal-suite questions before a quote is treated as final.
Fixed-scope pricing
Once the scope is confirmed, pricing is itemized so changes are tied to approved scope changes, not vague extras.
Free whole-house plan, floor by floor, with one fixed price.
Walls, wiring and plumbing decided once.
You don’t need finished drawings to start.
Tell us what you want to change. At a free estimate visit, we review the space, discuss your options and identify what needs to be included in your quote.
Recognized by global media
As seen in The Telegraph, Apartment Therapy and Homes & Gardens. 5× HomeStars Best of Awards winner.
- 2,000+ projects completed
- 25+ years of renovation experience
- $5M+ liability insurance
More project photos
WSIB
Covered
Plan your full-home renovation
Start with the numbers: full-home renovation costs in Toronto, then the full-home planning guide.
Our home renovation services
Other renovation services · Kitchen renovation
Basement renovation · Basement underpinning · Legal basement apartment · Bathroom renovation · Home additions
Basement underpinning
If low headroom limits the lower level, review floor lowering alongside the whole-home layout and the finishing work that follows. Explore basement underpinning.
01 scope, drawings, and permits
03 demolition, disposal, and prep
04 finish level and allowances
Got questions about whole home renovation in Toronto?
How much does a home renovation cost in Toronto?
GTA market planning ranges start at about $100 per renovated square foot for finish-led work, from about $175 for comprehensive renovation, and from about $300 for structural or high-end work. A 1,500 sq ft house at the lower band is a six-figure project. These are Canadian-dollar ranges before HST. Keeping the layout and services can simplify scope; moving plumbing, replacing systems, custom finishes and hidden repairs can add work. Your quote follows a visit and scope review.
Is there a grant for home improvements in Toronto?
Not for general renovations, but some parts of a project can qualify. Energy upgrades such as insulation and heat pumps may qualify under Ontario’s Home Renovation Savings Program. A self-contained suite for a senior or a relative with a disability may qualify for the federal Multigenerational Home Renovation Tax Credit. Each program sets its own rules; our Ontario renovation rebates finder lists them.
A qualifying family suite for a senior or an adult relative eligible for the disability tax credit may qualify for up to $7,000 for work completed in 2026. Toronto’s Basement Flooding Protection Subsidy can pay up to $6,650 per property for a backwater valve, sump pump and related work, when a City-licensed contractor does it, subject to annual funding. Adding a unit to an existing house in Toronto is exempt from development charges.
How long does a full home renovation take?
Our published planning guide gives 6–12 months from design start to move-in, including 2–4 months for design and permits together and 3–8 months for construction. Finish-led work can be quicker; extensive structural work or discoveries may take twelve months or more. Approvals, ordering, trade sequence and access affect the dates. Your finish date is written into the contract, with assumptions and changes recorded alongside the scope.
We don't have plans yet. Is it too early to call?
No. Most people call with a list, not plans. Send us photos of the rooms on your list on WhatsApp, and we’ll tell you what’s realistic and what to check first. The free 3D design and permit drawings come next, before you sign anything.
How much deposit do you take?
No big deposit. You pay in milestones tied to finished stages, and the final payment comes after your walkthrough. Whoever you hire, get the payment schedule in writing and know what each payment buys before you sign.
What should be planned together before rooms are priced?
Review flooring transitions, doorways, stairs, cabinetry and shared services alongside each room. An island changes circulation; opening a wall can affect structure, wiring and the adjoining finishes. Identify what can stay before choosing products. Our full-home planning guide helps put these decisions in order.
Can we renovate the main floor without redoing the whole house?
Yes. A connected renovation can focus on the main floor or selected rooms. Define the spaces and finishes to keep, then check how the new layout and services meet them. Whole-home planning does not require stripping out every sound element. For an older property, review visible condition, records, structure and services before expensive finishes are ordered; see the older-house renovation guide.
Do you handle permits and structural work in-house?
Yes. Drawings, permit submission, structural changes and basement underpinning are done by our own team, with required professional responsibilities identified in the scope. Toronto requires permits for many structural, plumbing, HVAC, addition and change-of-use projects. A complete eligible House Stream application has a 10-business-day review standard; eligible Express applications have a three-business-day review goal after intake. These are review clocks, not guaranteed permit issuance or construction start dates. We check your scope against the current streams and Express eligibility.
What should I compare before accepting a quote?
Compare the same rooms, materials, allowances, exclusions, permit responsibilities, demolition, disposal, protection and cleaning. Check payment milestones, change orders, schedule assumptions and warranty conditions. The confirmed quote includes design and 3D renderings, architect fees and drawings, materials and labour, disposal and post-construction cleaning. No structural fees are added outside the agreed scope or an approved change order. Travel time costs, administrative markups and overtime charges are not added to your invoice. Confirm how concealed conditions will be investigated and price changes before approval. Bring a competing quote for scope review; our 5% offer applies to the same scope.
Can we live in the house during the renovation?
Often yes for finish-led, phased work; usually no during a full gut or structural phase. Agree which rooms, services and access routes remain usable, with protection and the sequence recorded in the schedule. Plan future service routes before the first phase closes access that a later phase needs. The practical answer comes from your scope and household arrangements.
What should I send before asking for a renovation estimate?
Send photos or video, the rooms involved, your city, timing, budget direction and any plans, survey or quote you already have. You can call before you have drawings: explain what is not working and what you want to keep. Capable is based in Woodbridge, with a showroom available by appointment. Our home renovation service areas include Ajax, Aurora, Barrie, Bolton, Brampton, Brantford, Burlington, Caledon, Cambridge, Etobicoke, Guelph, Halton Hills, Hamilton, King City, Kitchener, Markham, Milton, Mississauga, Newmarket, Nobleton, North York, Oakville, Oshawa, Pickering, Richmond Hill, Scarborough, St Catharines, Stoney Creek, Thornhill, Vaughan, Whitby, Woodbridge.
What changes the budget most?
Kitchen and bathroom scope, plumbing and electrical work, structural changes, finish level, hidden repairs, access, permit assumptions, and how many trades must be coordinated usually move the budget most.
For an older property, use the older-house renovation checks before finishes are ordered.
Do I need permits for a renovation project?
Many projects do when structure, layout, plumbing, HVAC, additions, basement finishing with certain work, or legal-suite use is involved. Toronto Building says a permit is required for additions, material alterations, and several basement, heating, plumbing, and change-of-use situations. We treat permit needs as part of scope review, not as an afterthought.
How much does it cost to renovate a 2,000 sq ft house in Toronto?
In the GTA market, a whole-home update starts from about $100 per renovated sq ft, about $100,000 for 1,000 sq ft, before HST. Bigger changes cost more per foot, and your itemized quote shows where every dollar goes. Only the area you actually change counts. Keeping the layout and the plumbing where they are is the biggest way to stay near the low end.
What can I renovate for $100,000?
In the GTA, about $100K usually covers a finish-led renovation of roughly 1,000 sq ft: kitchen and bathroom finishes, floors, paint and trim, with the layout and main services kept. Or fewer rooms done more deeply, such as a kitchen with a layout change plus a full bathroom. Tell us your budget at the first call, and we’ll tell you what fits.
Can we renovate in phases and keep one contractor?
Yes. We design the whole house first, then you build in the order your life and budget allow. Each phase is built for the next: the beam, the drains, the panel and the stairs are sized for what comes later, so no phase undoes the one before it. One team and one set of drawings carry through every phase.
Is it better to renovate or move in Toronto?
If you like the street and the house has good bones, price the renovation first. Moving inside Toronto means paying both Ontario’s and Toronto’s land transfer tax ($52,950 on a $1.5 million house), plus commission, legal fees and the move, before you change a room. Moving usually wins when the location or the lot is the problem. Our stay-or-move guide walks through the math.
Do I need a general contractor or a design-build team for a whole-house renovation?
A general contractor builds from drawings someone else made, so design, permits and construction sit with different people. In design-build, one team designs, draws, permits and builds. On a whole house, that’s what keeps the kitchen, the beam, the panel and the basement in one plan. That’s how we work, underpinning included.
What happens if you find a problem behind the walls?
We check moisture and structure before we quote, so fewer surprises are left to find. Anything that still needs a closer look is written into the scope as an open item, with how it will be handled. If something changes once the walls are open, nothing goes ahead without your signature and a price.
We might sell in a few years. Is a whole-house renovation worth it?
Nobody can honestly promise what a buyer will pay. What we can do is build what buyers and their home inspectors usually look at: permits closed and inspections passed for the work that needed them, no sign of water in the basement, wiring and plumbing brought up to date, and a kitchen and bathrooms people want to live with. You keep the work documented: the drawings, the itemized scope of what was done, and the permit and inspection records. Our lifetime workmanship warranty, in writing, transfers to the next owner. If you’re selling within a year, tell us at the first visit, and we’ll tell you which parts are worth doing and which to leave to the buyer.
Now booking December starts. We only take 4 projects a month.
Why start your Toronto renovation with Capable
Everything on this page, in one place. Then tell us about your home and book your spot.
What you can get back
- Up to $7,700 Ontario insulation rebate
- Federal tax credit for a qualifying family suite
- Basement flooding protection — check eligibility
- $1,000 upgrade on us (projects over $40,000)
- 5% below any written quote, same scope and materials3
What you see first
- Free 3D design, value from $1,0002
- Free permit drawings
- One fixed, itemized price
- Your 4-step plan and written schedule
What protects you
- Lifetime workmanship warranty, in writing1
- $5M insurance and WSIB
- Pay as the work gets done
- One project lead, Friday photo report
Plan your renovation with us
Start with a free visit. You don’t need finished drawings. Yan answers calls and WhatsApp himself.
Get a free renovation estimate
Capable Group starts four new projects a month across all services.
Four project starts a month. Ask Yan for the next opening.
Now booking December starts. We only take 4 projects a month.
Itemized scope review
We flag allowances, exclusions, and assumptions before final pricing.
Design and material planning
See the finished renovation direction before you commit to the build.
On-time planning
We review scope, timing, and site constraints before the project moves forward.
“A clear scope today keeps the renovation from turning into guesswork later.”
Still deciding? See the projects in full
Each project names its real location and scope.
Choose Your Renovation Path
Legal Basement Suite
Code-aware planning and build support for a legal rental-ready basement path.
Kitchen Renovation
Layout, cabinets, counters, plumbing, electrical, appliance fit, materials, and downtime scoped before pricing.
Bathroom Renovation
Waterproofing, plumbing rough-ins, tile, fixtures, ventilation, and one-bathroom disruption reviewed before quote approval.
Home Addition
Feasibility, drawings, permits, structure, roofline, foundation, services, and access reviewed before the build path is chosen.
Basement Renovation
Ceiling height, moisture, layout, bathroom or kitchenette scope, egress, and finish level checked before basement pricing.
Full Home Upgrades
Use this route when several rooms, trades, finishes, access, and schedule risk need one coordinated renovation plan.
Main-floor living for parents.
A bedroom and full bathroom on the main floor, a walk-in shower with no step, wider doorways, planned with the rest of the house.
Our services · Choose your renovation path
One room now, the rest of the house later
One team, one plan. Add a room now or later.
Full home upgrades: use this route when several rooms, trades, finishes, access, and schedule risk need one coordinated renovation plan.
A full home renovation usually starts downstairs
Basement renovations near you
New to Capable? Start with our home renovation Toronto page: who we are, what we build and how to book a free visit.
Read before you decide
Guides for planning the whole house
Five short reads before you decide.
Allow for design, approvals and ordering as well as construction.
Understand how scope, layout, building systems and finish choices affect your renovation budget.
Investigate the existing structure and services before choosing finishes.
Check scope, allowances, exclusions, payments and change orders before you sign.
Put room priorities, drawings, approvals and material decisions in a useful order.
More finished rooms
Kitchens, bathrooms and living spaces from our whole-home projects. Swipe to see more.
Home renovation near you
Capable Group renovates homes across Toronto and the GTA. Choose your city.
- Ajax
- Aurora
- Barrie
- Bolton
- Brampton
- Brantford
- Burlington
- Caledon
- Cambridge
- Etobicoke
- Guelph
- Halton Hills
- Hamilton
- King City
- Kitchener
- Markham
- Milton
- Mississauga
- Newmarket
- Nobleton
- North York
- Oakville
- Oshawa
- Pickering
- Richmond Hill
- Scarborough
- St Catharines
- Stoney Creek
- Thornhill
- Vaughan
- Whitby
- Woodbridge
Terms
1. Lifetime workmanship warranty. In writing and transferable. Electrical issues have 2-year coverage. A $350 deposit is required to file a claim and is refunded if the issue is covered by the warranty. View warranty coverage and claims.
2. 3D design market comparison. Comparison packages start at $1,000 per room. Based on published package prices checked November 5, 2026, in Canadian dollars before tax. Those packages may include other services, and scope varies. This is not a cash credit, discount, or former Capable price.
3. 5% below any written quote. Bring a written quote for the same scope and materials to your free visit. We go through it with you line by line and confirm the 5% once both quotes cover the same work.
$1,000 upgrade on us. A free $1,000 upgrade on signed projects over $40,000. Choose from pot lights, a heated bathroom floor, upgraded tile or a closet build-out. The offer has no expiry date.