Completed Capable Group project · Richmond Hill
Richmond Hill Full-Home Renovation
The kitchen, dining room, staircase, bathrooms and living area in this Richmond Hill project use the same wood, black and white material palette. That consistency depends on practical coordination at each transition: floors, trim, cabinetry, lighting, plumbing and long-lead orders.
The completed project
One material plan across different rooms
Capable Group completed this Richmond Hill renovation across the main-floor kitchen, dining and living zones, the staircase, a full bathroom and a powder room. The visible result uses repeated wood, black and white finishes to connect spaces with very different jobs.
a multi-room renovation works better when circulation, cabinetry, lighting, flooring transitions, plumbing, trim and long-lead selections are coordinated before each room becomes its own change order.
30-second project video
See the rooms as one renovation
The video shows how the kitchen, dining area, staircase, bathrooms and living space relate to one another. That connection is difficult to understand from isolated detail photographs.
Open island layout, full-height cabinetry, integrated lighting and connected dining zones.
A glass-shower bathroom and a separate powder room use different layouts with related finish choices.
Updated railings, trim, flooring and custom details carry the material language between rooms.
Before construction
Shared decisions across the home
The kitchen, wet rooms, stairs and living areas share circulation, services and finish junctions. Resolving those connections early keeps room-specific choices from creating conflicts elsewhere.
- Define the circulation first.Measure walkways, island clearances, seating, door swings and how people move between the kitchen, dining area, stairs and living rooms.
- Coordinate every fixed element.Resolve cabinetry, plumbing, ventilation, electrical loads, lighting, railings and trim before custom orders begin.
- Use one material schedule.Compare flooring transitions, cabinet tones, counters, tile, metals, hardware and paint together instead of approving each room in isolation.
- Sequence wet rooms and shared finishes.Complete rough-ins and inspections before walls close, then install floors, cabinetry, tile, glass, trim and paint in a controlled order.
01 · Kitchen and dining
Plan the room-to-room flow before the island
The island anchors preparation, seating and circulation. The dining nook and living area then need clear routes around it without sacrificing storage or appliance access.
Work involved
- Measure the full connected zone, not only the cabinet walls.
- Confirm appliance, sink, island, seating, storage and walkway requirements together.
- Coordinate plumbing, electrical, ventilation and structural questions before cabinetry drawings are released.
- Lock counters, backsplash, hardware, lighting and flooring transitions before fabrication.
What changes the cost
The biggest budget variables here are removing walls or adding structural support, moving plumbing, ventilation or major electrical loads, custom cabinetry, built-in seating and specialty storage, and stone fabrication, appliances and corrections found after demolition.
02 · Bathrooms
Let the waterproofing and layout lead the finish choices
The full bathroom uses a glass shower and herringbone tile detail, while the powder room uses a compact vanity and stronger surface pattern. Each room needs its own fixture and moisture plan.
Work involved
- Confirm fixture locations, clearances, door swing, storage and electrical zones.
- Inspect plumbing, ventilation and subfloor conditions before closing the scope.
- Coordinate waterproofing, shower slope, tile layout, niche positions and custom glass.
- Complete required rough-in inspections before drywall, tile and finish installation.
What changes the cost
Costs in this part of the project are most sensitive to relocating drains, vents or supply lines, detailed tile patterns and custom shower glass, subfloor, moisture or framing repairs found during demolition, and custom vanities, stone, lighting and ventilation corrections.
03 · Stairs and living spaces
Carry the renovation through every transition
Stair railings, floor levels, trim lines and sightlines are shared conditions. If they are left until the end, the connection between finished rooms can look accidental.
Work involved
- Survey stair geometry, railing conditions, floor heights and transitions before selecting new surfaces.
- Resolve lighting, switching, outlets, built-ins and retained furniture zones early.
- Coordinate railings, trim, doors, flooring and paint across adjoining rooms.
- Protect completed work and sequence installation so one trade does not damage the next.
What changes the cost
Allow extra room in the budget for structural stair or opening changes, custom railings, millwork and feature walls, subfloor levelling and difficult flooring transitions, and electrical, lighting and wall repairs across several connected spaces.
More project photos
Stairs and bathrooms continue the material plan
The supporting photographs show how railings, flooring, trim, plumbing fixtures and custom details carry the renovation beyond the kitchen.
Work sequence
Typical work sequence
The work normally moves from survey and coordinated design through approvals, protected demolition, shared rough-ins, finishes and final checks.
- 1. Scope and site reviewMeasure every affected room, record what stays and identify visible access, service and condition constraints.
- 2. Layout, design and approvalsResolve room relationships, drawings, engineering and permit triggers before ordering custom items.
- 3. Protection and demolitionProtect retained areas, isolate dust and open only the scope needed to verify concealed conditions.
- 4. Structure and rough-insCoordinate framing, plumbing, electrical, ventilation and required inspections before walls close.
- 5. Surfaces, fixtures and close-outInstall flooring, cabinetry, tile, glass, railings, trim, paint and fixtures in a controlled order, then test and correct the work.
2026 Toronto and GTA market range
What could a Richmond Hill renovation like this cost?
These current Canadian-dollar market ranges help establish an early planning envelope. They are not the historical price of this Richmond Hill project and not a Capable Group quote.
The same-footprint versus layout-changing decision is critical. Custom cabinetry, structural work, moved services, stone and appliances can move the total quickly.
Plumbing changes, waterproofing, detailed tile, niches, custom glass, ventilation and repairs behind old finishes shape the range.
HomeStars uses this as a broad 2026 Toronto benchmark for a multi-room renovation. Full-gut, structural or major systems work can require a substantially higher plan.
Do not add the room ranges together to price this house. A coordinated scope can share protection, demolition, supervision and trade visits, while structural work and concealed conditions can outweigh those efficiencies. Compare estimates by inclusions, allowances, exclusions, design, permits, tax, contingency, service upgrades and close-out.
Timing
How long could the work take?
HomeStars’ June 2026 Toronto guide places a full-home renovation at roughly 4 to 8 months of construction, with 2 to 4 months of pre-construction planning on top. The exact path depends on design, approvals, custom lead times, property condition, scope and whether the home stays occupied.
Permit check
Could this work require a permit?
Possibly. Richmond Hill lists material interior alterations, plumbing or HVAC remodelling, basement finishing and additions among common permit triggers. Cosmetic work and installing cupboards may not need a building permit, but zoning and other rules can still apply.
Before requesting an estimate
Questions to settle before pricing connected rooms
Can these photographs confirm the exact scope or price?
No. They confirm the completed rooms and visible finish level. Measurements, retained work, service changes, permits and concealed conditions still need a project-specific review.
Should the kitchen and bathrooms be priced separately?
They can be shown as separate estimate sections, but shared plumbing, electrical, demolition, flooring and material orders should be coordinated in one scope.
Can the home stay occupied?
That depends on which kitchen, bathroom, entrance and mechanical services remain usable. Protection, temporary access and work-zone separation must be planned before the schedule is accepted.
What should we send for an initial review?
Send photographs of the connected rooms and transitions, note what should stay, and include known problems, must-haves, city and rough timing.
Your project
Planning a Richmond Hill home renovation?
Send photos of the rooms and the transitions between them, note what needs to change, and include your rough timing. We will review the shared scope and recommend the next step.
Photograph floors, doorways, stairs and service areas as well as the main feature rooms.