Richmond Hill Bathroom Renovation

This Richmond Hill project pairs a primary bathroom with two compact powder rooms. The larger room needs comfortable movement, storage and water control; the powder rooms use a smaller footprint and stronger feature materials.

Richmond Hill, OntarioBathroom renovationCompleted Capable Group project
Completed Richmond Hill primary bathroom with freestanding tub, double vanity and glass shower

The completed project

Waterproofing and fixture layout come first

The retained project archive shows a finished primary bathroom with a tub, glass shower and long vanity, plus compact powder rooms using stronger feature materials. Together, the rooms demonstrate two different design jobs: a daily wet room must prioritize movement, water control and storage, while a powder room can carry more visual character in a smaller footprint.

Start with fixture geometry, drainage, waterproofing, ventilation and cleaning access. Once those constraints are resolved, material combinations can make each room feel intentional without spending in every visible area.

Completed Richmond Hill powder room with stone vessel sink and wood vanity
The compact room uses a few high-impact elements while keeping the plan simple.
Primary bathroom

Tub, double vanity, glass shower, tile, lighting and comfortable clearances.

Powder rooms

Compact vanities, wall-mounted fittings and distinct feature-wall treatments.

Shared planning

Fixture schedules, plumbing, electrical, ventilation, substrates and finish sequencing across several rooms.

Before construction

What to confirm before ordering fixtures

Fixture dimensions, drainage, waterproofing, ventilation, wall backing and cleaning access control the layout. Finish selections should follow those fixed conditions.

  1. Measure every fixture and movement zone.Confirm door swings, shower entry, tub access, vanity depth, toilet clearance and the space needed to clean around each element.
  2. Inspect what water can damage.Check visible moisture history, subfloor condition, supply and drain routes, ventilation and the wall assemblies around showers and tubs.
  3. Lock the plumbing plan before finishes.Moving a toilet, tub or shower drain can change labour, permit requirements, floor work and the construction sequence.
  4. Coordinate all wall-mounted items.Place faucets, mirrors, lights, outlets, accessories, glass supports and wall backing from one approved elevation.
  5. Use feature materials selectively.Put budget into one or two high-impact surfaces and keep surrounding finishes durable, compatible and easy to maintain.

01 · Primary bathroom

Build the room around water, movement and storage

The finished bathroom combines a freestanding tub, glass shower and long vanity. The useful planning question is whether every fixture fits comfortably after wall build-ups, glass, tile and real door movement are included.

Richmond Hill bathroom with tub, double vanity and glass shower
Full-room view: fixture relationships, wet zones, storage and walking space.
Stone vessel sink and wood vanity in a Richmond Hill powder room
Detail view: faucet reach, basin height, wall finish and compact storage.

Work involved

  • Survey drains, supplies, ventilation, electrical and subfloor before finalizing the plan.
  • Specify shower waterproofing limits, slope, drain, niche, curb and glass support.
  • Confirm tub filler reach, vanity storage, mirror height and lighting positions.
  • Order fixtures only after dimensions and rough-in requirements are approved.

What changes the cost

The biggest budget variables here are plumbing and drain relocation, custom glass, vanity and stone, detailed tile cuts and substrate correction, and hidden moisture, framing or floor repairs.

02 · Powder rooms

Let one clear feature carry the room

The two powder rooms use different wall treatments, but both rely on accurate fixture placement. In a compact room, a small dimensional error is more visible and can affect faucet reach, splash control, knee room or service access.

Richmond Hill powder room with city mural and compact vanity
Mural room: a focused visual statement around a compact plumbing plan.
Richmond Hill powder room with brick feature wall and wall-mounted fixtures
Brick room: surface preparation, fixture backing and finish junctions.

Work involved

  • Mock up basin, faucet, mirror and light positions at full scale.
  • Provide backing for wall-mounted fixtures and accessories before closing walls.
  • Check cleanability and splash exposure when choosing textured or specialty finishes.
  • Keep shutoffs, traps, outlets and ventilation accessible.

What changes the cost

Costs in this part of the project are most sensitive to custom or wall-mounted plumbing components, feature-wall substrate preparation, small-room labour and detailed finish junctions, and electrical, ventilation and door changes.

More project photos

Wide views show the layout; details show the junctions

The photographs reveal movement between fixtures, vanity storage, faucet reach, tile edges and the locations that need backing or waterproofing.

Work sequence

Typical work sequence

Bathroom work normally moves from measurement and moisture review to an approved fixture plan, demolition, rough-ins, waterproofing, finishes and final testing.

  1. 1. Existing-condition surveyMeasure the room and record visible moisture, structure, plumbing, electrical, ventilation and access.
  2. 2. Layout and selectionsApprove fixture dimensions, clearances, elevations, tile limits, storage and permit triggers.
  3. 3. Protection and demolitionProtect the route to the room, isolate dust and open the approved scope to verify concealed conditions.
  4. 4. Rough-ins and wet-room assemblyComplete plumbing, electrical, ventilation, backing, subfloor, waterproofing and required inspections.
  5. 5. Finishes and testingInstall tile, cabinetry, glass, fixtures, lighting and accessories, then test drainage, ventilation and final operation.

2026 Toronto and GTA market range

What could a bathroom renovation like this cost?

This Canadian-dollar market range is an early planning reference. It is not the historical price of this Richmond Hill project and not a Capable Group quote.

Full bathroom renovation
$15k–$40k+

The lower end assumes a contained full-room scope. Plumbing relocation, custom glass, premium fixtures, detailed tile and repairs behind finishes can move the total higher.

A useful estimate should state design, demolition, labour, materials, fixtures or appliances, permits, tax, allowances, exclusions, protection, disposal and the method for handling concealed conditions.

Timing

How long could the work take?

A full bathroom commonly needs about two to four weeks of active construction after design, ordering and any permits. Custom glass, detailed tile, inspections and concealed repairs can extend the calendar.

Permit check

Could this work require a permit?

Possibly. Structural changes, plumbing work and other material alterations can change the permit path. Confirm the exact scope with Richmond Hill Building Services before construction starts.

Check Richmond Hill permit information →

Before requesting an estimate

Questions to settle before pricing a bathroom

Can a tub, shower and long vanity fit in my bathroom?

The answer depends on measured fixture sizes, door swing, shower entry, toilet clearance and cleaning access. A scaled layout should be approved before fixtures are ordered.

Should plumbing stay in the same locations?

Keeping usable drains and supplies can reduce floor and wall work. Movement may be worthwhile when the existing layout is unsafe or impractical, but it should be priced before finish selections.

What must be waterproofed?

The shower or tub assembly, penetrations, transitions and other wet areas need a specified system installed to the manufacturer requirements and applicable code. The substrate and drain details matter as much as the visible tile.

What should we send for an initial review?

Send photographs from every corner, approximate room dimensions, known moisture problems, fixture preferences, city and rough timing.

Your project

Planning a bathroom renovation in Richmond Hill?

Send photos from every side of the room, note the fixtures you want to keep or move, and include your rough timing. We will review the layout and recommend the next step.

Wait — before you go.

Homeowners who get a free estimate from Capable can save CAD $8,000-$20,000 by knowing what things should actually cost before they commit to a renovation quote.Depends on your project, scope, site conditions, finishes, and what is already included.

    Google Reviews badge for Capable Group renovation services.
    WSIB Ontario badge for Capable Group renovation contractor profile.
    HomeStars Verified badge for Capable Group renovation services.

    Get Your Free Renovation Estimate

    Homeowners who get a free estimate from Capable can save CAD $8,000-$20,000 by knowing what should actually be included before they commit to a renovation quote.

    Depends on your project, scope, site conditions, finishes, and what is already included.

      Google Reviews badge for Capable Group renovation services.
      WSIB Ontario badge for Capable Group renovation contractor profile.
      HomeStars Verified badge for Capable Group renovation services.