Renovation Timeline Planning: What Changes the Schedule
Phase 1: Scope, Site Review, Design, and Budget
- Review project type, city, photos, existing quotes, goals, timing, and rough budget
- Check site access, measurements, existing conditions, risk items, and permit-sensitive scope
- Clarify drawings, material selections, layout decisions, and quote assumptions when needed
- Confirm what is included, what is excluded, and what decisions can change price or schedule
Phase 2: Protection, Demolition, Framing, and Rough-Ins
- Removal of existing fixtures and finishes
- Installation of new framing and insulation
- Rough-in for electrical, plumbing, and HVAC systems
Phase 3: Electrical, Plumbing, HVAC, and Inspection Planning
- Installation of electrical wiring and fixtures
- Plumbing installation, including rough-in for bathroom and kitchen fixtures
- Installation of HVAC systems and ductwork
Watch VIdeo
Phase 5: Finishing, Deficiency Review, Cleanup, and Handoff
- Installation of trim and baseboards
- Painting and wallpapering
- Installation of fixtures and finishes, including lighting, cabinets, and countertops
- Final inspection and touch-ups as needed
A True Partnership
What Homeowners Say About Working With Capable Group
Tell Us About Your Project
Share the project type, city, timing, and a few notes. We’ll review the scope and reply with the next step.
Limited Availability For Upcoming Renovation Starts
✓
Itemized Scope Review
We flag allowances, exclusions, and assumptions before final pricing.
✓
Design & Material Planning
See the finished renovation direction before you commit to the build.
✓
On-Time Planning
We review scope, timing, and site constraints before the project moves forward.
“A clear scope today keeps the renovation from turning into guesswork later.”