Update, November 5, 2026: The federal program page now lists income thresholds and rules for eligible installations from November 1, 2026. The application portal is still expected in early 2027. Check your household, equipment and contractor against those rules before counting a rebate in your budget; funding is not guaranteed until approval.
full-home renovation in Toronto and the GTA — plan the scope, drawings and next step.
Canada announced a new National Heat Pump Rebate on October 8, 2026: up to $10,000 for eligible low- to median-income households, and $2,000 for other eligible homeowners. The program is expected in early 2027. If you are planning a Toronto or GTA renovation, it is worth checking before you choose the heating system—but the announcement is not an approval for your house.
For a home with a gas furnace, two questions need separate answers: will the installation qualify, and will the new system cost less to run? A rebate reduces the purchase cost. It does not establish the best heating system for your house. Ontario also has its own rebate today, with pre-approval required before installation.
What is confirmed, and what still needs rules?
The October 8 announcement introduced the program. The current federal page now sets out the requirements for installations during the retroactivity period, including income thresholds. Applications are still expected in early 2027; approval and payment are separate from installing a heat pump.
On a small screen, swipe the table sideways to see every column.
| Question | What is known on November 5, 2026 |
|---|---|
| How much? | $2,000 for eligible households above the income threshold, or up to $10,000 for those at or below it. Ontario thresholds depend on household size and after-tax income; see below. Equipment cost and program conditions also affect the amount. |
| Which equipment? | Eligible electric cold-climate air-source heat pumps on the program’s Eligible Products List. Do not assume every heat pump qualifies. |
| Is an energy audit required? | The federal announcement says no audit before or after installation. |
| How fast? | The October 8 backgrounder announced 24-hour application approval and five-day payment approval after receipts. The current program page says no payments will be made before the early-2027 launch and application approval. Those announcement targets are not a payment deadline for an installation today. |
| Can a landlord apply? | You must reside in Canada and own the home, or live in an Indigenous community where the home is owned by the local Indigenous government. An owned rental property can qualify. The current rule is one rebate per household, even if you own more than one property. The address must not previously have received federal heat-pump funding. |
| Can provincial rebates be combined? | The announcement says yes. The combined amount for a specific installation still needs confirmation under both programs’ rules. |
| When does it start? | Eligible installations from November 1, 2026 may qualify retroactively. Applications open in early 2027; an installation date alone does not establish eligibility or approval. |
For an installation before the portal opens, use the current retroactivity requirements. Buy through an HVAC contractor, have that contractor install the system, and check its AHRI number against the eligible product list. The system must be capable of heating the whole home. Keep receipts identifying the applicant and address, installer, equipment make/model/AHRI number, number of heat pumps and total installation cost, including directly related electrical or ductwork. The page says receipts must be submitted within six months, but it does not say when that period starts or how to submit before applications open. Keep the receipts and confirm the timing with the program. Rental or leased equipment may become eligible after launch, but that is not confirmed for the current retroactivity period.
Which household income qualifies for the $10,000 tier in Ontario?
Ontario now has published thresholds. To be considered for the higher rebate, your household after-tax income must be at or below the amount for its size: $46,981 for one person; $92,884 for two; $119,850 for three; $146,217 for four; or $158,202 for five or more. These are Canadian-dollar income thresholds, not guaranteed rebate amounts.
The program tells applicants to use their 2025 tax return: subtract line 43500 (total taxes payable) from line 23600 (net income). If you have a spouse or common-law partner, do the same for them and add the results. Use this program’s calculation rather than an average salary or another rebate’s threshold. The program will verify income when applications open.
Ontario’s existing Home Renovation Savings heat-pump amounts answer a different question: they depend on your current primary heating source and the eligible equipment. Its approval does not establish your federal income tier. Check both programs separately before subtracting rebates from the installation budget.
Renovating more than one room?
Whole-home renovations start from about $100 per sq ft. One team, one schedule and one fixed quote for the rooms that connect.
See how we work: Whole-home renovation in Toronto →
Does a gas-heated Toronto home qualify?
The current federal rules accept homes heated with natural gas as well as electricity, oil, propane and other listed fuels. You do not have to remove the existing heating system. The proposed heat pump must still meet the eligible-equipment and whole-home heating requirements. The government also cautions that switching from natural gas may not lower heating bills: the system, region and operating costs matter.
The federal release’s average annual saving of $1,400 refers to homes heating with oil or electric baseboards. It is not a gas-home savings estimate. The backgrounder also discusses propane and electric resistance heating. None of those averages predicts your bill.
Ask the HVAC contractor to compare suitable options using your actual energy bills, local rates, the house’s heating needs and the proposed backup heat. Include any electrical or duct changes in the installed cost. Then compare that total with the rebate you can actually confirm. A larger rebate does not automatically make a larger system the right choice. If the heating change is part of a bigger project, our full home renovation cost guide shows how mechanical work fits the total budget.
Ontario’s rebate is already available—and needs pre-approval
Ontario’s Home Renovation Savings heat-pump program bases its purchase rebates on the home’s existing primary heating source.
On a small screen, swipe the table sideways to see every column.
| Existing primary heat | Cold-climate air-source heat pump | Ground-source heat pump |
|---|---|---|
| Natural gas, with an active Enbridge residential account | $500 per ton, up to $2,000 | $3,000 |
| Electricity, oil, propane or wood, connected to Ontario’s electricity grid | $1,250 per ton, up to $7,500 | $2,000 per ton, up to $12,000 |
These are Ontario program amounts in Canadian dollars, not installation prices. Eligibility, equipment and capacity rules apply. Rental-equipment rebates have a separate schedule; do not use the purchase table for a rental agreement.
The owner applies through a participating HVAC contractor. Wait for pre-installation approval before the equipment is installed: Ontario says installations done before approval are ineligible. Heat pumps do not require a home energy assessment under this stream. The contractor completes the post-installation application; the program says the cheque should arrive within 60 days of its approval.
Ontario’s heat pump stream has no published calendar deadline, unlike the province’s attic insulation and assessment rebates, which have November 30, 2026 deadlines. The contractor files the post-installation application within 30 days of installation. Ontario’s participant agreement rules out other Enbridge, Save on Energy or Ontario-government rebates for the same work; it doesn’t mention federal rebates, and the federal announcement says its rebate can be combined with provincial programs. Confirm both sets of rules before you count on both.
If insulation or windows are part of the same project, those November 30 deadlines, the new November electricity prices and the full rebate table are in our guide to Ontario electricity rates from November 1, 2026.
Do not add the federal and Ontario maximums into your construction budget yet. The federal announcement permits combining programs, but your heating source, equipment, income eligibility and final conditions determine what you receive. Ask the participating contractor to identify each program and approval separately. Our Ontario renovation rebates guide lists the other programs to check while you wait for the final rules.
For insulation, windows, accessibility work or a family suite, continue with our Ontario basement renovation rebates and tax credits guide. Those programs have different purposes and application steps.
What to do before the federal portal opens
If the existing system is working and replacement is part of a planned renovation, use this period to settle the design and compare equipment. Subscribe through the official program page for the launch and eligibility rules. Make the purchase decision using costs you can carry without an unapproved rebate.
Mind the date. Installations before November 1, 2026 are outside the stated retroactivity period. For a planned replacement, check the current criteria and eligible product list before signing, and ask the installer to document the equipment match and whole-home sizing. Never delay restoring safe heat to wait for a rebate. The program says its criteria are still being finalized and remain subject to change. Eligibility is assessed against the criteria in effect on the installation date, and final approval still matters.
If the furnace fails, get qualified help to restore safe heating. Do not leave the home without adequate heat while waiting for a future application portal. Before accepting a heat-pump proposal:
- Ask which current program the installation can qualify for, and obtain Ontario pre-approval where applicable.
- Get the proposed equipment models, installation scope, backup heating and any electrical or duct alterations in writing.
- Keep the itemized invoice, proof of payment, installation date and equipment records. The final federal document requirements may add to this list.
- Check the published eligibility criteria and eligible heat pump list before committing. Keep the AHRI equipment number and installation records; the November 1 start date alone does not make a purchase eligible.
Make the heating decision before the renovation walls close
A heat pump may be a relatively contained installation, or it may affect work across several rooms. The difference should be established while the renovation is being planned. Natural Resources Canada notes that some installations need ductwork or electrical-service modifications, and that system sizing depends on the house’s heating and cooling loads.
Which projects this touches most:
- Whole-home renovation: size the heating for the finished, better-insulated house, not the old one.
- Home addition: new rooms add heating and cooling load. Check whether the existing system can carry it, or whether a whole-house heat pump makes sense now.
- Legal basement suite: the suite’s heating and ventilation go into the permit drawings, so decide the system then. The federal rebate is limited to one per household.
- Basement finishing and underpinning: the foundation walls are open, which is when insulating them costs the least. Ontario pays $900–$1,500 for basement wall insulation if the energy assessment happens before work starts.
Start with the house you are building toward. If the renovation will add insulation, replace windows or change the conditioned space, give that scope to the HVAC designer. Choosing equipment for the existing house without accounting for those changes can miss the heating needs of the finished project. NRCan’s heat-pump sizing guide considers building loads and existing duct capacity together.
Coordinate service routes and electrical capacity. Have the HVAC contractor identify any duct alterations, and a Licensed Electrical Contractor assess the electrical work alongside other planned loads. A panel upgrade is not automatic. In Ontario, hired electrical work must be done by a Licensed Electrical Contractor, with the applicable ESA notification and inspection process.
Keep usable space and access in the plan. Ask what indoor equipment remains, where the outdoor unit will go, and how service access, clearances, condensate and defrost water will be handled. Replacing space heating does not automatically remove the water heater. For a basement apartment, settle these details before treating the mechanical area as available living space.
Toronto lists installing or modifying heating systems as work requiring a building permit, while replacing a furnace or boiler in a house appears on its no-permit list. The scope matters; confirm the proposed heat-pump and duct alterations with Toronto Building. Our Toronto and GTA renovation permits guide explains the separate approval paths and links to the City’s requirements.
The reason to decide early is practical: service changes can be coordinated with the areas already being opened, instead of discovering after painting that another wall or ceiling needs access. Use our full-home renovation planning guide to place those decisions in the work sequence, and the older Toronto house guide to organize the initial investigation.
Where Capable fits in
If the heat pump is one part of a wider renovation, the rooms, mechanical space and electrical work need one coordinated scope. That is the conversation to bring to Capable. The program administrator decides rebate eligibility; a renovation enquiry is not a rebate application.
Read about our whole-home renovation service in Toronto, or open “Get a Quote” on this page to tell us the city, rooms involved, current heating system and planned timing. For a heat-pump-only installation under Ontario’s program, start with its participating HVAC contractor route.
Quick answers
Can I apply for the new federal heat pump rebate now?
Not yet. Applications are expected to open in early 2027. The federal page now lists retroactivity rules and income thresholds for eligible installations from November 1, 2026. Check them before buying and keep the required receipts. No rebate is paid until the program launches and your application is approved.
Is the $10,000 rebate available to everyone?
No. The higher rebate is up to $10,000 for eligible households whose after-tax income is at or below the threshold for their province and household size. Ontario’s published thresholds are listed above. Other eligible households may receive $2,000. Income, installation and equipment requirements still apply; neither amount is guaranteed before approval.
Do I need a broken furnace or an energy audit?
No. The current federal page accepts planned and emergency installations, requires no energy audit before or after installation, and says you do not need to remove the existing system or prove it broke down. The contractor, equipment, whole-home heating and other eligibility rules still apply.
Will the government pay within five days?
That was the payment-approval target in the October 8 announcement, separate from receiving money in a bank account. For the current retroactivity period, the federal page says no payments will be made until the early-2027 launch and application approval. Do not budget on receiving payment five days after an installation today.
Can I combine the federal rebate with Ontario’s program?
The federal announcement says its rebate can be combined with provincial programs. Both sets of rules must still be met, including Ontario’s mandatory pre-installation approval. Confirm the eligible amounts and any combined limits before subtracting them from the installation cost; adding headline maximums is not an approved claim.
Will an installation in fall 2026 qualify retroactively?
It may, if installed on or after November 1, 2026 and all applicable conditions are met. The equipment must be on the eligible list and bought from and installed by an HVAC contractor. Household, property and receipt requirements also apply. Installations before November 1 are outside the stated retroactivity period. Funding requires an approved application after the portal opens in early 2027.
What changes on November 1, 2026?
Three things. The federal heat-pump retroactivity period starts, with eligibility rules now published. Ontario’s regulated electricity prices drop about 7%. And the Ontario Electricity Rebate on hydro bills falls from 23.5% to 15.7%, so compare the full bill using your own consumption and utility charges before assuming that lower electricity prices mean lower costs.
Federal rebate requirements rechecked November 5, 2026; Ontario heat-pump purchase amounts rechecked November 2, 2026; renovation-planning sources retain their October 8, 2026 review. This guide covers the homeowner rebate and renovation-planning questions; program approval remains separate from a contractor’s quote.
Planning a renovation with heating changes?
Tell us your city, rooms involved and planned timing. We’ll review the renovation scope and reply with the next step.
This is a renovation enquiry, not a rebate application.