Whole Home Renovation in Toronto, Planned and Priced as One Project

When the kitchen, bathrooms and living spaces all need work, each room’s decisions can change the next. A moved wall affects flooring and services; a new kitchen affects the rooms around it. Capable Group plans the layout, materials, building systems, approvals and construction together, then prices the confirmed scope in one fixed, itemized quote.

Bring us the changes you want to make and the parts of the house you want to keep. A free estimate visit helps establish how they fit together, what needs further investigation and what should be included before construction starts.

$5M+ Insured & WSIB

Liability coverage and WSIB status can be shown before work starts, so homeowners know who is responsible on site.

Permit & Code Planning

We flag permit, structure, plumbing, electrical, and legal-suite questions before a quote is treated as final.

Fixed-Scope Pricing

Once the scope is confirmed, pricing is itemized so changes are tied to approved scope changes, not vague extras.

What does a whole-home renovation cost in Toronto?

A finish-led whole-home update has a published GTA market planning range of about $100–$175 per renovated square foot. More comprehensive work is around $175–$300, while structural or high-end transformations are priced above $300 per renovated square foot. The lower range assumes a lighter scope that retains more of the existing layout and systems.

All prices in Canadian dollars, before HST unless stated.

These are market planning bands, not a Capable price list. Our full-home cost guide shows starting examples by house size and the scope behind those numbers.

Use the area actually being renovated, then define the scope. Retaining a suitable kitchen footprint, sound services and usable finishes can reduce the work. Moving plumbing, opening structural walls, replacing systems or commissioning custom cabinetry adds different responsibilities and costs. Confirm design, engineering, permits, appliances, HST and other exclusions when comparing figures. Accommodation, exterior work, concealed repairs and contingency also need their own budget decisions.

Capable Group 2021 HomeStars renovation award badge.
Capable Group 2022 renovation award badge.
Capable Group 2023 renovation award badge.
Capable Group 2020 renovation award badge.
Capable Group 2021 renovation award badge.
Capable Group 2024 renovation award badge.
Capable Group 2025 renovation award badge.

Capable Group

Schedule Plan

Milestones, ordering, permits, and trade sequencing are discussed before construction starts.

Warranty Clarity

Warranty terms and responsibilities should be written clearly before you sign.

Detailed Quote Review

We can review competing quotes for missing scope, allowances, exclusions, and risky assumptions.

Design & Material Guidance

Layout, finish, and material decisions are clarified before they become change orders.

Typical Contractor

Unsupported timelines

A schedule that ignores permits, materials, site access, and trade sequencing is not a real plan.

Unclear warranty language

A warranty is less useful if coverage, exclusions, and responsibility are not explained.

Allowance-heavy pricing

Low quotes often hide permit, disposal, prep, or finish allowances that change later.

Thin design support

A sketch is not enough when layout, finishes, and fixtures are still undecided.

What should be planned together before rooms are priced?

Plan the connections between rooms alongside the rooms themselves. Flooring transitions, doorways, stairs, cabinetry and shared services can affect several areas at once. Capable connects your priorities to a coordinated layout and construction scope, so the estimate can show how those decisions work across the home.

For example, an island affects the passage into the dining area and access to appliances. A new floor meets existing doors, stairs and adjoining rooms. Those are useful design checks because approving each item separately can leave a conflict for the installation stage.

Start by explaining the change you need in daily use: a kitchen that is easier to move through, bathrooms with useful storage, or rooms that connect more naturally. Then identify what can stay. The full-home planning guide helps put those decisions in order before finishes and custom orders lock the scope.

Does the entire house need to be stripped out?

The scope should follow the condition of the house and the change you want. A coordinated whole-home renovation can retain sound elements. Structural alterations, damaged assemblies or unsuitable services may require more extensive opening and replacement. Establish the necessary work before describing the project as a finish update or a full gut renovation.

An older Toronto house deserves particular attention before expensive surfaces are selected. Records, visible condition, structure and building systems can reveal questions requiring professional assessment. A freshly decorated room cannot tell you everything about what is concealed behind it. Our older-house renovation guide explains the investigations to consider.

If a decision remains unresolved, show it in the scope rather than relying on an assumption. That lets you compare the cost of retaining an element with the work needed to replace it, and makes the boundary of the fixed quote easier to understand.

How long does a whole-home renovation take?

Our published planning guide gives 6–12 months from design start to move-in for a GTA full-home renovation. It describes 2–4 months for design and permits together and 3–8 months for construction. These are early planning ranges for their stated phases, not a guaranteed completion date. Full-home renovation timeline.

The design-and-permit figure is one combined phase. It does not establish a separate two-to-four-month allowance for each activity. Nor should the endpoints of the phase ranges be added to create a promised total. Finish-led work can be quicker. A full gut, addition, underpinning, major systems replacement or difficult discovery in an older house may need twelve months or more.

Capable plans starts around approvals, materials, trades, access and current capacity. Before accepting a schedule, clarify which decisions must be completed, which products need ordering and what conditions could change the sequence. That discussion should also explain how the household will use the property while the work is underway.

Does Toronto’s review clock tell you when building can start?

A municipal review clock describes part of the approval process. Toronto publishes a 10-business-day review standard for complete applications in its House Stream, covering specified houses with no more than two dwelling units. The actual project must meet the stream’s conditions. Toronto permit review streams.

Eligible interior projects may fit Toronto’s Express stream, which has a three-business-day review goal after intake. Residential additions are excluded. A review can produce comments or require further information, so either figure should be kept separate from permit issuance, design preparation and construction. Check the actual scope against Express eligibility.

This is why permit questions belong before a start date is fixed. Capable flags structure, plumbing, electrical and legal-suite questions during scope planning. If your whole-home project includes an addition or basement apartment, identify that work explicitly rather than assuming a general interior-renovation approval covers it.

Decide What Changes—and What Stays

Your renovation can cover the main floor, several connected rooms or the whole house. Start with the spaces you want to improve, then identify the layouts, features and finishes worth keeping.

Connect the Layout to the Work Behind It

Moving a kitchen, opening a wall or adding a bathroom can affect structure, plumbing, electrical work and ventilation. Reviewing those connections early helps turn the design into a defined construction scope.

Coordinate the Build Around Your Home

Permits, material deliveries and the order of trade work affect the schedule. Access, dust protection and the rooms you can keep using also need a plan, especially if you hope to stay at home.

Ready to review your renovation scope?

Send the rooms involved, photos or drawings, city, timing, rough budget, and any quote you already have. We will route the project to the right next step before you book.

See the Safer Planning Path

Review how Capable separates scope, price, permits, timeline, and exclusions before construction starts.

Recognized by Global Media

Read homeowner reviews

Read what homeowners say about their experience with Capable Group.

Read homeowner reviews →

Rob from Capable Group presenting basement renovation ideas in Toronto with a modern fireplace and mounted flat-screen TV in the background

Plan & Price

Photos, rooms involved, city, timing, budget range, and quote gaps.

Design & Materials

Layout, finish decisions, drawings, and ordering plan where needed.

Permits & Prep

Permit needs, trade coordination, access, site protection, and material lead times.

Build & Clean

Managed trades, site protection, progress updates, cleanup, and handover.

Keep the budget clear as decisions change

Agree the scope first. We itemize the confirmed work. Match the quote to your drawings and selections; check allowances, exclusions and how concealed repairs will be handled.

Price a change before you approve it. A moved fixture or new finish can affect other rooms and trades. Ask for its cost and schedule impact in writing.

Keep decisions visible. Agree your project contact and how progress and approvals are recorded. Check payment stages, warranty terms, insurance and WSIB information before work begins.

See the work across real GTA homes

Richmond Hill: the kitchen meets the living space

Tile-to-wood flooring transition beside the island in Capable Group’s completed Richmond Hill kitchen renovation.
Tile meets wood flooring around the island. That junction belongs in the plan alongside cabinetry and room circulation.
View the Richmond Hill project and video →

Mississauga: the renovation continues downstairs

Finished basement family room with fireplace and recessed lighting in Capable Group’s Mississauga renovation.
This finished family room is part of Capable’s home-and-basement renovation.
View the Mississauga project →

From homeowner reviews

“They updated our kitchen and three bathrooms.” — Lois, April 3, 2025

“The renovations they did to our bathroom truly make it stand out, and the new kitchen looks fantastic.” — Doris, April 30, 2025

Renovating in phases?

Plan the full scope before starting the first phase, including future service routes and finish junctions. Agree which rooms, access routes and services remain usable. That arrangement decides whether you can stay at home during construction.

Included in Every Quote

Never On Your Invoice

Send photos, scope, or an existing quote for review.

Choose Your Renovation Path

What a Toronto Renovation Quote Should Include

01   Scope, Drawings, and Permits

Clear plans, drawings, and permit assumptions are what stop a quote from changing shape halfway through the job.

Bathrooms, kitchens, laundry, or layout changes often trigger plumbing, electrical, and HVAC work that must be priced honestly from the start.

Demolition, disposal, framing adjustments, leveling, and hidden repair prep are common areas where low quotes miss real work.

Finish quality matters, but so do material allowances. A realistic quote explains what grade of flooring, tile, fixtures, and trim is actually included.

Schedule reliability depends on approvals, material ordering, trade coordination, and site access, not just on a promised finish date.

A good renovation quote explains warranty coverage, what is excluded, and how change orders are handled if hidden conditions show up later.

Projects Completed.
2,000 +
Years in Business
25 +
Professional Team
40 +
Areas in Ontario
50 +

Got Questions about Whole Home Renovation in Toronto?

How much does a whole home renovation in Toronto usually cost?

It depends on scope. Finish-only upgrades price very differently from projects that change layout, add plumbing, move walls, update systems, or need drawings and permits. The useful first step is to define what is included before comparing numbers.

What changes the budget most?

Kitchen and bathroom scope, plumbing and electrical work, structural changes, finish level, hidden repairs, access, permit assumptions, and how many trades must be coordinated usually move the budget most.

For an older property, use the older-house renovation checks before finishes are ordered.

Do I need permits for a renovation project?

Many projects do when structure, layout, plumbing, HVAC, additions, basement finishing with certain work, or legal-suite use is involved. Toronto Building says a permit is required for additions, material alterations, and several basement, heating, plumbing, and change-of-use situations. We treat permit needs as part of scope review, not as an afterthought.

What should I compare before accepting a quote?

Compare scope, drawings, permit assumptions, demolition and disposal, site protection, allowances, exclusions, timeline logic, warranty terms, and how change orders will be handled if hidden conditions show up.

Can we renovate the main floor without redoing the whole house?

Yes. A connected renovation can focus on the main floor or selected rooms. Define which spaces and finishes stay, then check how the new layout, floors and building services will meet the areas you are keeping.

How long does a full-home renovation take?

The schedule depends on the scope, design decisions, approvals, material availability and conditions uncovered during construction. Separate the planning and ordering period from the build itself. Our full-home renovation timeline guide explains the stages to allow for.

What should I send before asking for a renovation estimate?

Send photos or video, the rooms involved, your city, rough timeline, budget comfort zone, any drawings or survey you already have, and any contractor quote you want reviewed. This helps separate real savings from missing scope.

Toronto Building permit guidance

Plan Your Full-Home Renovation

Our Home Renovation Service Areas

Request a free renovation estimate

    Google Reviews badge for Capable Group renovation services.
    WSIB Ontario badge for Capable Group renovation contractor profile.
    HomeStars Verified badge for Capable Group renovation services.

    LIMITED AVAILABILITY FOR UPCOMING RENOVATION STARTS

    Itemized Scope Review

    We flag allowances, exclusions, and assumptions before final pricing.

    Design & Material Planning

    See the finished renovation direction before you commit to the build.

    On-Time Planning

    We review scope, timing, and site constraints before the project moves forward.

    “A clear scope today keeps the renovation from turning into guesswork later.”

    Get Your Free Renovation Estimate

    We beat any quote by 5%.

    Depends on your project, scope, site conditions, finishes, and what is already included.

      Google Reviews badge for Capable Group renovation services.
      WSIB Ontario badge for Capable Group renovation contractor profile.
      HomeStars Verified badge for Capable Group renovation services.

      Wait — before you go.

      We beat any quote by 5%.Depends on your project, scope, site conditions, finishes, and what is already included.

        Google Reviews badge for Capable Group renovation services.
        WSIB Ontario badge for Capable Group renovation contractor profile.
        HomeStars Verified badge for Capable Group renovation services.